21 May 2018 in Mining Technology: Transactions of the Institutions of Mining and Metallurgy
RPRodrigo de Lemos Peroni
Dilution and ore loss are important factors that can affect costs and profitability of a mining operation by lowering the quantity of mineral or metal that can be produced from each ton of processed ore. When discussing open-pit mining, dilution and ore loss are sometimes assumed as fixed factors in geostatistical block models and cut-off grade calculations, without considering specific particularities of the deposit and operation. This paper proposes to quantify the dilution caused by operational inefficiency through identifying the ore blocks that are a part of the short-term plans and mapping their neighbourhood, considering the nature of the contacts and the differences in grades. This technique enables the operational dilution to be calculated. It is applicable for operations using mechanical excavation and/or blasting. The results demonstrate that operational dilution can be measured and controlled to improve the tonnage and grade reconciliation between planning and production.
1 June 2019 in REM - International Engineering Journal
The transport distance in a mining operation strongly influences a mine operation revenue and its operational cycle because it is a fundamental part of the total mining costs. Generally, the transport route is determined based on an engineer's practical knowledge, which does not consider any mechanism to optimize the possible routes to be taken. In an attempt to establish a methodology for calculating the path that results in minimum costs to transport the mined block to its destination, the Dijkstra methodology is applied to a tree graph analysis, where the mining blocks are analysed as nodes of the tree. The transport cost is reflected as the arc of the graphs, which can use the Euclidean distance or the transport time for the calculation of the minimum path. The result obtained from the Dijkstra algorithm provided a non-operational route; to overcome this problem, an adjustment was performed through non-parametric equations. In this manner, it was possible to determine the transport costs for each block of the model. The paths based on Euclidean distance and transport time showed a tendency to increase for deeper mining regions. Identifying areas of largest growth and correctly quantifying their values increase the efficiency of mining planning.
1 March 2020 in REM - International Engineering Journal
The traditionally and widely used Lerchs-Grossmann algorithm presents well-known limitations that newer propositions attempt to overcome. The direct block schedule (DBS) methodology, which has gained relevance with computational advances, obtains the final pit as a natural result of production sequencing, different from Lerchs-Grossmann-based algorithms. This process flow applies constraints in the final pit definition stage attempting to provide a more realistic result and to minimize risks. Slope instability is a common and inherent risk to open pit mining and may affect the project's net present value (NPV). A study of the impacts of slope angle variations on safety indexes and final pit NPV provides an auxiliary tool for the overall slope angle definition process. This article presents a case study in which the effects of variations of the overall slope angle on the safety factor (SF) and project NPV were analyzed. A total of 25 pits were generated by each studied final pit definition methodology, and each pit had the sections with the varied slope angles analyzed in the stability assessment, resulting in a total of 150 slopes analyzed. A comparison between the results obtained by the two different methodologies implemented in commercial software is presented. The results show no relationship between the NPV and the overall slope angle using the DBS methodology. An analysis of the results for each geotechnical sector obtained by the traditional methodology was conducted and may contribute to the trade-off analysis between the best slope angle to achieve a reasonable SF and the maximum NPV.
1 October 2019 in REM - International Engineering Journal
The production rate of a mining operation has an important effect on the operational cycle and gross profit, which are often evaluated based on engineering practices. Assessment of the economic performance of mine operations in mining engineering is of great importance because an incorrect production rate can result in significant financial losses. The production rate is composed of two bases: the cost estimation and the price scenario. Bureau of Mines studies performed on American mines indicated that processing costs can be estimated through the production rate. This article proposes to connect the model presented by the Bureau of Mines and queuing theory to describe the operational costs, which are used to develop a production optimization methodology. The proposed cost composition describes a production system to verify the law of diminishing returns and the economy of scale. Between these regions of the production curve, the optimum point was determined with mathematical precision.
1 December 2016 in REM - International Engineering Journal
In open pit mining, dilution is not always a factor systematically analyzed and calculated. Often it is only an adjusted number, for example, calculated or even empirically determined for a certain operational condition perpetuating along time in the form of a constant applied to calculating reserves or mine planning in attendance of audit requirements. Dilution and loss are factors that should be always considered for tonnage and grade estimates. These factors are always associated and can be determined considering several particularities of the deposit and the operation itself. In this study, a methodology was determined to identify blocks adjacent to the blocks previously planned to be mined. Thus, it is possible to estimate the dilution caused by poor operating efficiency, taking into account the inability of the equipment to perfectly remove each block, respecting its limits. Mining dilution is defined as the incorporation of waste material to ore due to the operational incapacity to efficiently separate the materials during the mining process, considering the physical processes, and the operating and geometric configurations of the mining with the equipment available.