Existing welded steel moment frames are designed to tolerate substantial yielding and plastic rotation under earthquake loads. This sacrificial design approach can lead to permanent, and often irreparable damage when interstory drifts exceed 2%. The experimental seismic performance of a 50% full-scale damage avoidance designed structural steel beam-column connection is presented. The beam-column joint region consists of a top flange-hung beam connected to the column by an angle bracket. High-force-to-volume (HF2V) devices are attached from the column to the beam to provide joint rigidity and energy dissipation as the joint opens and closes. The HF2V devices are connected either below the beam flange or concealed above the beam’s lower flange. Reversed cyclic lateral load tests are conducted with drift amplitudes up to 4%. No damage is observed in the principal beam and column structural elements. The need for stiff device connections to achieve optimal device performance is demonstrated, and potential design solutions presented. Stable hysteresis and repeatable energy dissipation for a large number of cycles up to the 4% drift level is observed. It is concluded that superior and repeatable energy dissipation without damage can be achieved for every dynamic motion cycle, in contrast to conventional sacrificially designed welded moment frame connections.
1 September 2015 in Journal of Loss Prevention in the Process Industries
The performance of a new full-depth precast overhang panel system for concrete bridge decks is investigated experimentally. In contrast to conventional cast-in-place deck overhangs, the proposed full-depth precast overhang system has the potential to speed up construction, reduce costs, and improve safety. Load-deformation behavior up to factored design load limits is first investigated. The panel is then loaded near its edge to examine the collapse capacity and the associated failure modes—particularly the influence of panel-to-panel connections that exist, transverse to the bridge deck axis. Comparative tests are also conducted with a conventional cast-in-place overhang system. When compared to the conventional cast-in-place overhang behavior, the experimental results show that the precast full-depth overhang introduces different behavior modes, largely due to the influence of the partial depth panel-to-panel connection, which reduces the capacity by some 13%.
Full-depth precast deck slab cantilevers also referred to as full-depth precast concrete bridge deck overhang panels are becoming increasingly popular in concrete bridge deck construction. To date, no simple theory is able to estimate the overhang capacity of full-depth concrete bridge deck slabs accurately. Observations suggest that interaction between flexure and shear is likely to occur as neither alone provides an accurate estimate of the load-carrying capacity. Therefore, modified yield line theory is presented in this paper, which accounts for the development length of the mild steel reinforcing to reach yield strength. Failure of the full-depth panels is influenced by the presence of the partial-depth transverse panel-to-panel seam. When applying a load on the edge of the seam, the loaded panel fails under flexure while the seam fails in shear. Through the use of the modified yield line theory coupled with a panel-to-panel shear interaction, analytical predictions are accurate within 1–6% of experimental results for critical cases.
Performance of a new full-depth precast overhang panel system for concrete bridge decks is investigated experimentally. In contrast to conventional cast-in-place deck overhangs, the proposed full-depth precast overhang system has the potential to speed up construction, reduce costs, improve construction safety and improve durability of the bridge system. To validate the capacity of the proposed overhang system, quasi-static monotonic tests are conducted on two precast overhang double-panel specimens and a conventional overhang. Factored design load limits are applied to the overhang to investigate the load-deformation capacity. Each overhang is then loaded near its edge to examine the collapse capacity and the associated failure modes—particularly the influence of panel-to-panel connections for the full-depth precast panels. When compared to the conventional cast-in-place overhang behavior, the experimental results show that the precast full-depth overhang introduces different behavior modes, largely due to the influence of the partial depth panel-to-panel connection. This reduces the ultimate carrying capacity by some 13 percent, but in spite of this reduction, behavior is satisfactory with a high margin of safety above the AASHTO LRFD design loads.
Modern concrete bridge decks commonly consist of stay-in-place (SIP) precast panels seated on precast concrete beams and topped with cast-in-place (CIP) reinforced concrete. Such composite bridge decks have been experimentally tested by various researchers to assess structural performance. However, a failure theory that describes the failure mechanism and accurately predicts the corresponding load has not been previously derived. When monotonically increasing patch loads are applied, delamination occurs between the CIP concrete and SIP panels, with a compound shear-flexure mechanism resulting. An additive model of flexural yield line failure in the lower SIP precast prestressed panels and punching shear in the upper CIP-reinforced concrete portion of the deck system is derived. Analyses are compared to full-scale experimental results of a tandem wheel load straddling adjacent SIP panels and a trailing wheel load on a single panel. Alone, both yield line and punching-shear theories gave poor predictions of the observed failure load; however, the proposed compound shear-flexure failure mechanism load capacities are within 2% accuracy of the experimentally observed loads. Better estimation using the proposed theory of composite SIP-CIP deck system capacities will aid in improving the design efficiency of these systems.