Jiaqi Zhang

Dr. Jiaqi Zhang

none yet
orcid

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
26 November 2022 in Energies
Verified
Journal Article
Open access
PDF file
YRYapeng Ren
Yapeng Ren
XLXinli Lu
Xinli Lu
WZWei Zhang
Wei Zhang
JZJiaqi Zhang
Jiaqi Zhang
JLJiali Liu Liu
Jiali Liu Liu
YZYalin Zhang
Yalin Zhang
Geothermal heating is considered to be one of the low-carbon-energy technologies for building heating. Aiming at the problem that the operating cost and investment cost of geothermal heating systems are still high, the conventional geothermal heating system coupled with energy storage for office building heating is studied in this paper. Four operational strategy models of the coupled system are established based on time-of-use electricity prices. A genetic algorithm is used to find the optimal value of each decision variable using minimization of levelized cost of heat (LCOH) as the objective function. The influences of electricity and equipment prices on the optimal values of the decision variables are discussed. Four operation strategies are investigated. If only operating cost is considered in the optimization, comparison shows that the best operation strategy is the one giving high priority to use the energy storage tank for heating during the peak electricity period. However, if the investment cost is further considered in the optimization, the best operation strategy is the one using the energy storage tank for heat load peak-regulating. In addition, based on the minimization of LCOH, an optimal energy storage ratio is found for each scenario, and suitable conditions of using energy storage tank are discussed. The geothermal heating system coupled with energy storage can have a good performance when the peak-valley electricity price difference is higher than CNY 0.566/kW·h (USD 0.0847/kW·h)+ or the energy storage tank price is lower than CNY 900/m3 (USD 134.64/m3). The results obtained from this study prove that the cost of geothermal heating systems can be effectively reduced by choosing an optimal operation strategy and using an energy storage device with an optimal energy storage ratio.

29 April 2022 in Processes
Verified
Journal Article
Open access
PDF file
JZJiaqi Zhang
Jiaqi Zhang
XLXinli Lu
Xinli Lu
WZWei Zhang
Wei Zhang
JLJiali Liu Liu
Jiali Liu Liu
WYWen Yue
Wen Yue
MFMa feng
Ma feng
Medium-depth and deep geothermal energy has been widely used because of its abundant resources and supply stability. Recently, attention has been given to the closed-loop heat extraction system using a deep borehole heat exchanger (DBHE), which enables geothermal energy to be harnessed almost everywhere. In this study, a check valve is adopted in a DBHE system in which the whole section of the well is used for heat extraction in winter during building heating and the upper part of the well is used for heat injection in summer during building cooling. The influence of injected water flowrates, water inlet temperatures, depths of the check valve and formation of thermal conductivities on the performance of this novel DBHE system has been investigated. It is found that heat injection through the upper part of the well in summer can improve the heat extraction rates to a certain extent during the heating season. In summer, the inlet temperature of water has a great influence on the heat injection rates. The increase in the depth of the check valve improves the heat injection rates of the novel DBHE system. When the depth of the check valve is 900 m, the heat injection rates in summer can reach 51.03 kW, which is 27.55% of the heat extraction rates in winter. In this case, the heat injection in summer has the greatest effect on the improvement of heat extraction in winter, which is 6.05 kW, accounting for 3.38% of the heat extraction in that year. It is found that the thermal conductivity of the formation has a great influence on the heat extraction rates in winter and heat injection rates in summer. The proposed novel DBHE system can be used to inject the heat discharged from the building in summer and extract geothermal energy for building heating in winter, forming a better heat balance at certain depths and resulting in a sustainable operation for heating and cooling. Another benefit of using this system is that the heat discharged from air conditioning into the air can be reduced in summer and “urban thermal pollution” can be alleviated.

4 March 2022 in Processes
Verified
Journal Article
Open access
PDF file
CGChangyou Geng
Changyou Geng
XLXinli Lu
Xinli Lu
HYHao Yu
Hao Yu
WZWei Zhang
Wei Zhang
JZJiaqi Zhang
Jiaqi Zhang
JWJiansheng Wang
Jiansheng Wang
As obtained geofluids from enhanced geothermal systems usually have lower temperatures and contain chemicals and impurities, a novel power cycle (NPC) with a unit capacity of several hundred kilowatts has been configured and developed in this study, with particular reference to the geofluid temperature (heat source) ranging from 110 °C to 170 °C. Using a suitable CO2-based mixture working fluid, a transcritical power cycle was developed. The novelty of the developed power cycle lies in the fact that an increasing-pressure endothermic process was realized in a few-hundred-meters-long downhole heat exchanger (DHE) by making use of gravitational potential energy, which increases the working fluid’s pressure and temperature at the turbine inlet and, hence, increases the cycle’s power output. The increasing-pressure endothermic process in the DHE has a better match with the temperature change of the heat source (geofluid), as does the exothermic process in the condenser with the temperature change of the sink (cooling water), which reduces the heat transfer irreversibility and improves the cycle efficiency. Power cycle performance has been analyzed in terms of the effects of mass fraction of the mixture working fluids, the working fluid’s flowrate and its DHE inlet pressure, geofluid flowrate, and the length of the DHE. Results show that, for a given geofluid’s temperature and mass flowrate, the cycle’s net power output is a strong function of the working-fluid’s flowrate, as well as of its DHE inlet pressure. Too high or too low of a DHE inlet pressure results in a lower power output. When geofluid temperature is 130 °C, the optimum DHE inlet pressure is found to be 11 MPa, corresponding to an optimum working-fluid flowrate of 6.5 kg/s. The longer the DHE, the greater the corresponding working-fluid flowrate and the higher the net power output. For geofluid temperature ranging from 110 °C to 170 °C, the developed NPC has a better thermodynamic performance than the conventional ORC. The advantage of using the developed NPC becomes obvious when geofluid temperature is low. The maximum net power output difference between the NPC and the ORC happens when the geofluid temperature is 130 °C and NPC’s working fluid mass fraction (R32/CO2) is 0.5/0.5.

7 January 2022 in Processes
Verified
Journal Article
Open access
PDF file
JZJiaqi Zhang
Jiaqi Zhang
XLXinli Lu
Xinli Lu
WZWei Zhang
Wei Zhang
JLJiali Liu Liu
Jiali Liu Liu
WYWen Yue
Wen Yue
FMFeng Ma
Feng Ma
With the changing world energy structure, the development of renewable energy sources is gradually accelerating. Among them, close attention has been given to geothermal energy because of its abundant resources and supply stability. In this article, a deep borehole heat exchanger (DBHE) is coupled with a heat pump system to calculate the heat supply and daily electricity consumption of the system. To make better use of the peaks and valleys in electricity prices, the following three daily operating modes were studied: 24-h operation (Mode 1), 8-h operation plus 16-h non-operation (Mode 2), and two cycles of 4-h operation and 8-h non-operation (Mode 3). Simulation results show that scheduled non-continuous operation can effectively improve the outlet temperature of the heat extraction fluid circulating in the DBHE. The heat extraction rates of Mode 1 is 190.9 kW for mass flowrate of 9 kg/s; in Mode 2 and Mode 3 cases, the rates change to 304.7 kW and 293.0 kW, respectively. The daily operational electricity cost of Mode 1 is the greatest because of 24-h operation; due to scheduled non-continuous operation, the daily operational electricity cost of Mode 3 is only about 66% of that of Mode 2. After an 8-month period without heating, the formation-temperature can be restored within 4 °C of its original state; 90% recovery of the formation-temperature can be achieved by the end of the second month of the non-operation season.