Zhongqing Sang

Zhongqing Sang


Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
21 March 2022 in Advances in Multimedia
Verified
Journal Article
Open access
PDF file
YSYinguan Song
Yinguan Song
YZYu Zou
Yu Zou
YSYifeng Su
Yifeng Su
MWMing Wang
Ming Wang
ZXZhenjun Xie
Zhenjun Xie
ZSZhongqing Sang
Zhongqing Sang
By using the data collected by the cluster intelligent and complex optimization of the power system equipment, the cluster intelligent and complex optimization algorithms are introduced into the CAD-aided intelligent operation and maintenance of power system equipment (CAD-IOMPSE). Based on this, the CAD-aided intelligent operation and maintenance graph of power system equipment is used to apply the cluster intelligent complex data contained in the quality inspection of the different types of data obtained to restrict the relationship between different entities for the value of knowledge contained in the collected power data in the operation process and control stage of the power system. According to the types of equipment with problems in the operation of power system, the defects and problems are quickly diagnosed to quickly locate the problems and give solutions. Finally, the results of example analysis show that compared with the traditional naming entity recognition algorithm, BiLSTM-softmax and Seq2Seq-Attention model, the algorithm in this study is better than the traditional algorithm in the three evaluation index values of accuracy, recall, and F1 value.

2 September 2021 in PLOS ONE
Verified
Journal Article
Open access
PDF file
ZSZhongqing Sang
Zhongqing Sang
KYKai Yang
Kai Yang
RZRencheng Zhang
Rencheng Zhang
The purposes are to find the techniques suitable for the safety relay protection of intelligent substations and discuss the applicability of edge computing in relay protection. Regarding relay protection in intelligent substations, edge computing and optimized simulated annealing algorithm (OSAA) are combined innovatively to form an edge computing strategy. On this basis, an edge computing model is proposed based on relay fault traveling waves. Under different computing shunt tasks, OSAA can converge after about 1,100 iterations, and its computing time is relatively short. As the global optimal time delay reaches 0.5295, the corresponding computing time is 456.27s, apparently better than the linear search method. The proposed model can reduce the computing time significantly, playing an active role in the safe shunting of power relays. The simulation also finds that the voltage and current waveforms corresponding to the fault state of Phase A are consistent with the actual situations. To sum up, this model provides a reference for improving and optimizing intelligent substation relay protection.

26 January 2022 in Machines
Verified
Journal Article
Open access
PDF file
MXMaoguang Xu
Maoguang Xu
ZSZhongqing Sang
Zhongqing Sang
XLXiang Li
Xiang Li
YYYimin You
Yimin You
DDDongyun Dai
Dongyun Dai
With the further development of harmonic pollution in the power system, scientists have carried out research on harmonics. Among them, harmonic detection is the first step in harmonic research. In this paper, a harmonic detection method based on an observer is proposed. This method first uses the cascaded Second-Order Generalized Integration (SOGI) algorithm, which can filter the Direct Current (DC) component of the input signal to extract the fundamental frequency, and then uses a time-varying observer to extract the harmonics. This can be used to extract harmonics from a distorted online grid signal. The effectiveness of the proposed method was evaluated on the Speedgoat Rapid Control Prototype (RCP) platform. The results show that it can complete the convergence within 0.05 s, and the standard deviation after stability will not exceed 1%.

27 November 2023 in Electronics
Verified
Journal Article
Open access
PDF file
ZSZhongqing Sang
Zhongqing Sang
SLshaojie Li
shaojie Li
YHYuanyuan Huang
Yuanyuan Huang
XGXin Gao
Xin Gao
RQRui Qiao
Rui Qiao
In the process of hardware-in-the-loop simulations (HILs) of indirect matrix converters (IMCs), solving the mathematical models of complex multiswitching converter topologies has become a major problem. The conventional approach is to split the complex mathematical model into multiple serial subsystems; however, this inevitably produces delays in the simulation steps between different subsystems, leading to numerical oscillations. In this paper, the method of latency-free decoupling is adopted, which has no time-step delay between different subsystems, making each subsystem a parallel operation. This can improve the numerical stability of the simulations and can effectively reduce the step size of the real-time simulation and alleviate the problem of real-time simulation resource consumption. In this paper, we discuss in detail the modeling process of IMC hardware-in-the-loop simulations with Finite Control Set Model Predictive Control (FCS-MPC), and experimentally validate our method using the Speedgoat test platform, resulting in a simulation step size of less than 200 ns. The simulation results are compared with the results of Matlab’s Simpower power system, which allows us to evaluate the accuracy of our model.

12 September 2021 in Mathematics
Verified
Journal Article
Open access
PDF file
Po LiPo Li
Po Li
XLXiang Li
Xiang Li
JLJinghui Li
Jinghui Li
YYYimin You
Yimin You
ZSZhongqing Sang
Zhongqing Sang
Harmonic interference is a major hazard in the current power system that affects power quality. How to extract harmonics quickly and accurately is the premise to ensure the sustainable operation of power system, which is particularly important in the field of new energy power generation. In this paper, a harmonic extraction method based on a time-varying observer is proposed. Firstly, a frequency estimation algorithm is used to estimate the power grid current frequency, which can estimate the frequency in real time. Then, applying the zero-crossing detection method to convert the frequency into a phase variable. Finally, using the phase variable and integral current signal as input, a observer is modeled to extract each order harmonic component. The proposed method is evaluated on a FGPA test platform, which shows that the method can extract the harmonic components of the grid current and converge within 80 ms even in the presence of grid distortions. In the verification case, the relative errors of the 1st, 5th, 7th and 11th harmonics are 0.005%, −0.003%, 0.251% and 0.620%, respectively, which are sufficiently small.

10 December 2025 in Symmetry
Verified
Journal Article
Open access
PDF file
XGXin Gao
Xin Gao
YHYuanyuan Huang
Yuanyuan Huang
SLshaojie Li
shaojie Li
昌刘昌兴 刘
昌兴 刘
ZSZhongqing Sang
Zhongqing Sang
As a multi-switching power electronic circuit with complex variable topology, the three-level active neutral point clamped (ANPC) converter is a complex system with strong coupling and low linearity. It has numerous high-speed switching devices, a large number of switch states, and a high matrix dimension. Modeling each switch will undoubtedly further increase the circuit size. While in real-time simulation, updating all states of the model to produce outputs within a single time step results in a significant computational load, causing an increasing consumption of FPGA hardware resources as the number of switches and circuit size grow. In order to solve this problem, the current common practice is to decompose the entire complex power electronic system into smaller serial subsystems for modeling. The overall modeling approach for small circuits can be achieved, but when the size of the circuit increases, the overall modeling complexity and difficulty are increased or even impossible to achieve. Decoupling power electronic circuits with this decomposition into subsystem modeling not only reduces the matrix dimension and simplifies the modeling process, but also improves the computational efficiency of the real-time simulator. However, this inevitably generates simulation delays between different subsystems, leading to numerical oscillations. In an effort to overcome this challenge, this paper adopts the method of parallel computation after subsystem partitioning. There is no one-beat delay between different subsystems, and there is no loss of accuracy, which can improve the numerical stability of the modeling and can effectively reduce the step length of real-time simulation and alleviate the problem of real-time simulation resource consumption. In addition, to address the problems of low accuracy due to the traditional forward Euler method as a solver and the possibility of significant errors at some moments, this paper uses a modified prediction correction method to solve the discrete mathematical model, which provides higher accuracy as well as higher stability. And, different from the traditional control method, this paper uses an improved FCS-MPC strategy to control the switching transients of the ANPC model, which achieves a very good control effect. Finally, a simulation step size of less than 60 ns is successfully realized by empirical demonstration on the Speedgoat test platform. Meanwhile, the accuracy of our model can be objectively evaluated by comparing it with the simulation results of the Matlab Simpower system.