Wooseok Kim

Dr. Wooseok Kim

orcid

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
27 September 2018 in Sustainability
Verified
Journal Article
Open access
PDF file
SPSangki Park
Sangki Park
WKWooseok Kim
Wooseok Kim
JLJonghyun Lee
Jonghyun Lee
YBYong Baek
Yong Baek
Slope failure is a natural hazard occurring around the world and can lead to severe damage of properties and loss of lives. Even in stabilized slopes, changes in external loads, such as those from earthquakes, may cause slope failure and collapse, generating social impacts and, eventually causing loss of lives. In this research, the slope stability changes caused by the Gyeongju earthquake, which occurred on 12 September 2016, are numerically analyzed in a slope located in the Gyeongju area, South Korea. Slope property data, collected through an on-site survey, was used in the analysis. Additionally, slope stability changes with and without the earthquake were analyzed and compared. The analysis was performed within a peak ground acceleration (PGA) range of 0.0 (g)–2.0 (g) to identify the correlation between the slope safety factor and peak ground acceleration. The correlation between the slope safety factor and peak ground acceleration could be used as a reference for performing on-site slope stability evaluations. It also provides a reference for design and earthquake stability improvements in the slopes of road and tunnel construction projects, thus supporting the attainment of slope stability in South Korea.

25 June 2025 in Buildings
Verified
Journal Article
Open access
PDF file
JYJiseok Yun
Jiseok Yun
HYHankyu Yoo
Hankyu Yoo
SHSungpil Hwang
Sungpil Hwang
WKWooseok Kim
Wooseok Kim
HKHan-eol Kim
Han-eol Kim
The Tunnel Boring Machine (TBM) method has gained attention as an eco-friendly tunneling technique, effectively reducing noise, vibration, and carbon emissions compared to conventional blasting methods. However, ground settlement and volume loss are inevitable during TBM excavation due to the deformation of the surrounding ground, which may even lead to ground collapse in severe cases. In this study, a Shield TBM model, validated using field data, was employed to perform numerical analyses on parameters such as tunnel diameter, ground elastic modulus, face pressure, and backfill pressure. Based on the simulation results, the influence of each parameter on settlement was evaluated, and a predictive model for estimating maximum settlement was developed. The proposed model was statistically validated using p-value assessment, variance inflation factor (VIF), coefficient of determination (R2), and residual analysis. Furthermore, the prediction model showed high agreement with the field data, yielding a prediction error of 8.25%. This study emphasizes the applicability of verified numerical modeling for accurately predicting ground settlement in Shield TBM tunneling and provides a reliable approach for settlement prediction under varying construction conditions.

3 September 2024 in Buildings
Verified
Journal Article
Open access
PDF file
HKHan-eol Kim
Han-eol Kim
SHSungpil Hwang
Sungpil Hwang
WYWan-Kyu Yoo
Wan-Kyu Yoo
WKWooseok Kim
Wooseok Kim
CKChang-Yong Kim
Chang-Yong Kim
HYHankyu Yoo
Hankyu Yoo
This study introduces a simplified method for predicting the optimal cutting conditions to maximize excavation efficiency based on tool forces. A laboratory-scale linear rock-cutting test was conducted using a conical pick on Finike limestone. The tool forces and their ratios were analyzed in relation to cutting parameters such as penetration depth and spacing. While the cutting force (FC) and normal force (FN) increased with the penetration depth and spacing, this relationship could not predict the optimal cutting conditions. The ratio of the mean normal force to the mean cutting force (FNm/FCm) increased with the penetration depth and the ratio of spacing to penetration depth (s/d). However, even while including this relationship, predicting optimal cutting conditions remained challenging. The ratio of the peak cutting force to the mean cutting force (FCp/FCm) reached a maximum value at a specific s/d, which is similar to the relationship between the specific energy (SE) and s/d. The optimal s/d obtained through the SE methodology was found to be between 3 and 5, and FCp/FCm reached a maximum at s/d. The error between the optimal s/d and the s/d in which FCp/FCm was maximized was less than 5%. Therefore, it was confirmed that the optimal cutting conditions could be predicted through the relationship between FCp/FCm and s/d. Additionally, by using the results from previous studies, the optimal cutting conditions obtained from the SE methodology and the proposed methodology were found to agree within a margin of error of 20%. The proposed methodology can be beneficial for the design of cutter heads and the operation of excavation machines.

4 December 2024 in Sustainability
Verified
Journal Article
Open access
PDF file
WKWooseok Kim
Wooseok Kim
SHSungpil Hwang
Sungpil Hwang
Hyangsun HanHyangsun Han
Hyangsun Han
BPByungsuk Park
Byungsuk Park
WYWankyu Yoo
Wankyu Yoo
Satellite data have emerged as a widely used tool for global research. In particular, satellite data aid in overcoming long-term observational challenges caused by seasonal effects, facilitating comprehensive monitoring of large regions and simplifying infrastructure maintenance. However, in Korea, the application of satellite SAR (Synthetic Aperture Radar) data within the construction sector remains relatively limited. This study used satellite SAR data to analyze the effects of infrastructure (underground roads and subway systems) currently under construction in Korea on the surrounding ground surface, in order to identify risk zones. This study explored methods for continuously monitoring extensive areas over long distances and selecting potential risk zones. The results indicated substantial ground displacements at specific locations and seasonal changes. Furthermore, past and current satellite SAR data were overlapped to facilitate a time-series analysis. The results confirmed that satellite SAR can improve the monitoring of construction projects in Korea and provide valuable information that can contribute to enhancing maintenance efforts, including near-future ground displacement data. The results are expected to help citizens maintain a safe and sustainable life in urban areas.

6 February 2023 in Applied Sciences
Verified
Journal Article
Open access
PDF file
MKMin-Seong Kim
Min-Seong Kim
WYWan-Kyu Yoo
Wan-Kyu Yoo
WKWooseok Kim
Wooseok Kim
SHSungpil Hwang
Sungpil Hwang
CKChang-Yong Kim
Chang-Yong Kim
SLSean Seungwon Lee
Sean Seungwon Lee
The long and large-diameter uncharged hole-boring (LLB) method is a cut-blasting method used to reduce vibration induced by blasting. This method typically involves creating an uncharged hole with a 382 mm diameter and drilling 50 m in the tunnel excavation direction at a time. This method is reported to provide relatively good vibration reduction and with high blasting efficiency through short hole blasting compared to traditional cut methods. In this study, an advanced LLB method incorporating deck charge blasting was investigated to improve the blasting efficiency during long hole blasting. Numerical analysis was performed via ANSYS LS-DYNA to investigate the effectiveness of the deck charge technique. In the original LLB method, explosives were used to break the rocks more finely, and the fragmented rocks were concen trated at the end of the blast holes. On the contrary, the modified LLB, in which two-part explosives were loaded into the blast holes, is expected to push the fragmented rocks to the tunnel face more effectively than the original LLB method. Therefore, it is expected that the proposed LLB method combined with a deck charge technique can achieve superior blasting efficiency.

9 October 2026 in Sensors
Verified
Journal Article
Open access
PDF file
SLSangyun Lee
Sangyun Lee
BPByungsuk Park
Byungsuk Park
WKWooseok Kim
Wooseok Kim
SHSungpil Hwang
Sungpil Hwang
Internet of Things (IoT)-based slope monitoring systems support real-time stability surveillance, but frequent false alarms cause alarm fatigue and delay responses to genuine hazards. We developed a clustering-based framework that classifies alarm causes into three categories—Malfunction, Actual Displacement, and Others—from inclinometer and extensometer data. From 55 alarm events recorded at 43 monitoring stations in 2025, 85 domain-informed features (statistical, waveform, spatial-correlation, trend, sudden-synchronization, and malfunction-pattern) were extracted and compared across five feature-extraction methods, six selection levels, and three clustering algorithms. Because the feature ranking uses expert-assigned labels, the framework is characterized as label-informed feature ranking followed by unsupervised clustering, and it was evaluated with 100 random seeds, nested leave-one-site-out validation, bootstrap confidence intervals, and permutation tests. A compact set of five features—three cross-correlation-based synchronization features and two spatial-correlation features—was stable across seeds and achieved a leave-one-site-out accuracy of 0.80 (95% CI 0.69–0.89) with the full 8 h window. Using only data recorded up to the alarm time, accuracy rose to 0.91 (0.84–0.98), 12 of the 13 Actual Displacement events were recovered (recall 0.92), and no non-displacement event was assigned to the displacement cluster. Synchronization features separated genuine displacement from the other causes, whereas spatial-correlation features distinguished external disturbance from sensor malfunction. The interpretable framework is proposed as a decision-support filter that complements conventional threshold-based alarms.