The smart grid paradigm has provided great opportunities to decrease energy consumption and electricity bills of end-users. Among a wide variety of end-users, electrical railway systems (ERSs) with huge installed power should be considered as a vital option in order to avoid wasted energy provided that an energy management system is utilized. In this study, a mixed-integer linear programming (MILP) model of a railway station energy management (RSEM) system is formulated by a stochastic approach, aiming to utilize the emerged regenerative braking energy (RBE) during the braking mode in order to supply station loads. Furthermore, the proposed RSEM model is composed of an energy storage system (ESS), RBE utilization, photovoltaic (PV) generation units, and an external grid in this paper. The passengers' impact on RBE as well as the stochastic behaviour of the initial state-of-energy (SOE) of ESS along with uncertainty of PV generation by the RSEM model are also evaluated. The model is tested under a bunch of case studies formed considering several combinations of the cases that an ESS or PV are available or not and using RBE is possible or not.
1 November 2018 in Electric Power Systems Research
Increasing demand for electricity, as well as rising environmental and economic concerns have resulted in renewable energy sources being a center of attraction. Integration of these renewable energy resources into power systems is usually achieved through distributed generation (DG) techniques, and the number of such applications increases daily. As conventional power systems do not have an infrastructure that is compatible with these energy sources and generation systems, such integration applications may cause various problems in power systems. Therefore, planning is an essential part of DG integration, especially for power systems with intermittent renewable energy sources with the objective of minimizing problems and maximizing benefits. In this study, a mathematical model is proposed to calculate the maximum permissible DG integration capacity without causing overvoltage problems in the power systems. In the proposed mathematical model, both the minimum loading condition and maximum generation condition are taken into consideration. In order to prove the effectiveness and the consistency of the proposed mathematical model, it is applied to a test system with different case studies, and the results are compared with the results obtained from other models in the literature.
The increasing number of distributed generation (DG) units in the distribution systems poses a challenge on protection systems in terms of coordination. In addition, the single characteristic based conventional protection causes an increase in the primary operation time of the relays due to the coordination between relay pairs. As a consequence, earlier studies investigated the utilization of non-standard characteristics and protection schemes in order to ease the insufficiencies of the standard approach. However, a commonly accepted protection approach that mitigates the effect of DG while providing lower primary operating time by levering the benefits of the non-standard protection strategy has not been developed so far. In order to overcome the aforementioned drawbacks of traditional protection, this paper firstly introduces a non-standard characteristic and then proffers an unconventional protection strategy, which utilizes a double characteristic. The suggested protection approach is tested on the IEEE 14 Bus distribution system including synchronous generator based DG connection. The results show that the proposed characteristic and protection scheme are able to provide a substantial decrease in the operation time of the relays while meeting the coordination requirements.