Rock particles in excavated materials can damage and wear down slurry discharge pipelines when slurry shield tunneling occurs in a pebble layer and rock ground. This pipeline damage and wear, if not properly dealt with, can lead to a broken-down tunneling machine. Based on a slurry shield tunneling project in China, damage and wear were thoroughly examined. The observed pipeline wear and leaks, transported rock particles, mechanical properties, and flow rate of the carrier slurry were presented. The measured results showed that the wear rates of a straight pipe, a pipe along a curved tunnel, a 60° inclined pipe, and a 90° elbow pipe in pebble ground were approximately 0.71 mm/100 rings, 1 mm/100 rings, 2.14 mm/100 rings, and 4 mm/100 rings, respectively. When the machine drove into rock ground, the wear rates increased by one to two times, which could be attributed to the sharper particle shapes. Countermeasures to address these issues, such as adjusting the pipeline layout, welding reinforcement plates in advance, and preparing additional pipes, were highlighted. The wear rates of different types of pipes, the effectiveness of new pipeline fixing methods, and the probability of pipeline leaks in different strata were discussed in detail.
When a slurry TBM advances in pebble and rock strata, large rock particles are carried in pipelines out of a tunnel by moving slurry. To estimate the wear of horizontally straight slurry discharge pipes, a phenomenological model was proposed that was mainly based on knowledge gained by means of direct and indirect in situ observations. The proposed model applies an equation composed of three variables, namely, the wear rate (λ), the central angle (2α), and the excavated tunnel length (L), to estimate the wear distribution along a pipe’s internal surface. The results indicated that wear mainly occurred on the bottoms of pipes. In addition, linear relationships between the maximum pipe wear amount (δmax) and the excavated tunnel length (L) were found for specific pipes and specified types of ground. The observed wear rates of different pipes in different types of ground had varied constants. The wear rates were higher for pipes in rock ground than for those in a pebble layer. For horizontally straight pipes, the observed wear rates were 0.0045 mm/m in a pebble layer and 0.0212 mm/m in rock ground. Lastly, to improve the proposed model, more field monitoring will be necessary to determine the pipe wear rates in different types of ground in the future.
During slurry shield tunneling in hard rock or cobble strata, the discharge pipes suffer serve wear and damage. However, the effect mechanism of pipe wall wear defects on the flow characteristics of two-phase flow is unclear. In this study, a three-dimensional slurry particle model of pipeline transport was established using the coupled computational fluid dynamics–discrete element method (CFD-DEM) considering the pipe wall wear defect, and the typical pipeline forms of straight pipe and 90° elbow pipe were selected as the research targets. The results indicated that the localized wear defect of pipes can lead to increased inhomogeneity in the velocity distribution, generating localized low-flow zones and resulting in a reduced flow rate or stagnancy in parts of the pipe. Meanwhile, the wear defect of the pipe results in local shape changes, so that the fluid flow path through the pipe is no longer smooth, causing more vortex/turbulence and secondary flow, where an increased vortex promotes localized kinetic energy reduction and creates larger pressure losses at the elbow. In addition, for the elbow pipe without wear defect, the pressure drop of the elbow increases quadratically from an increase of 6.5% to an increase of 16.9%, with the maximum wear depth increasing from 4 mm to 19 mm. For the straight pipe without wear defect, the pressure drop of the elbow increases linearly, from an increase of 2.2% to an increase of 10.2% with the maximum wear depth increasing from 4 mm to 19 mm. The paper investigates the potential mechanism of pipe flow characteristics influenced by wear defect and provides practical guidelines for the efficient operation of a slurry shield circulating system.
The large-diameter slurry tunnel boring machine (TBM) is widely used in the construction of tunnels across rivers and seas. However, cutter wear has become a critical issue that severely limits the tunnelling efficiency. Taking the Qingdao Jiaozhou Bay Second Subsea Tunnel Project as the background, the wear patterns of disc cutters on the atmospheric cutterhead of a large-diameter slurry TBM under complex geological conditions were analyzed. The flat wear of disc cutters induced by factors such as rock chip accumulation in front of the cutterhead, the jump trajectory when changing disc cutters, alloy-insert disc cutter mismatch, cutter barrel clogging, and severe wear of scrapers is discussed. Furthermore, the impacts of measures such as slurry circulation to remove rock chips during TBM stoppage, clay dispersant injection into the slurry chamber, cutter barrel flushing, and the wear resistance optimization of cutters and cutter barrels on reducing cutter wear were investigated. Based on numerical simulations and field data, a methodology for determining the optimal timing for cutter replacement is proposed. The results indicate the following: The circulation system effectively reduces accumulation, minimizing secondary wear of the disc cutters and lowering the risk of clogging in the cutter barrel. Adopting measures such as shield shutdown, a circulation system to carry away the slag, cutter barrel flushing, and soaking in 2% dispersant for 8 h can effectively reduce the accumulation of rock chips and mud cakes on the cutterhead, which in turn reduces the flat wear of the disc cutter. Measures such as making the cutter body and cutter ring rotate together and adding wear-resistant plates to the cutter barrel greatly improve the life of the cutter. The sharp increase in composite parameters can serve as an effective marker for assessing cutter conditions. The findings of this study can provide valuable insights into reducing cutter wear in similar projects.
As underground space development advances toward long-distance and high-water-pressure scenarios, underwater shield docking has become a key technical challenge. To control grouting-induced disturbance during underwater shield docking, this study develops a low-disturbance curtain grouting design and control framework for a large-diameter shield operating under high water pressure. Taking the Jiangyin–Jingjiang Yangtze River Tunnel as the engineering background and focusing on its alternating silty fine sand and silty clay strata, a comprehensive methodology integrating in situ grouting tests, large-scale physical grouting tests, three-dimensional numerical simulations, and on-site monitoring was employed. The study systematically reveals the diffusion law of grout pressure and the superposition mechanism of additional stress during grouting. Key findings include: (1) In sandy strata, the grouting pressure exhibits a significant influence range of 0–3 m, with a peak additional pressure of 1.0 MPa, showing an inverse relationship with diffusion distance. In clay strata, the peak pressure reaches 1.4 MPa with a dissipation cycle of approximately 6 days. (2) Continuous grouting produces a pronounced pressure superposition effect, which is substantially stronger in silty clay than in sandy strata; a skip-hole interval of ≥3 holes effectively mitigates pressure accumulation. (3) Stress concentration near the shield body is prominent, with the maximum additional stress reaching 1.0 MPa. Numerical simulations indicate a maximum shield displacement of 19.3 mm and a localized von Mises stress of 355 MPa, slightly exceeding the nominal yield strength of 345 MPa and indicating the onset of local yielding. This localized yielding identifies a critical stress control region of the shield body and highlights the necessity of limiting grouting-induced stress accumulation. Based on these insights, a graded grouting parameter control strategy is proposed to ensure deformation compliance with engineering requirements. Field monitoring during the grouting stage showed that the optimized strategy effectively limited grouting-induced pressure accumulation and structural response. After recalibration using the actual construction loading and structural boundary conditions, the numerical prediction at the critical shield waist monitoring location showed good agreement with the corresponding field measurement. These results support the feasibility of the proposed low-disturbance grouting framework under the investigated project conditions. This field application validates the feasibility and effectiveness of the proposed method under the geological and hydraulic conditions of the Jiangyin–Jingjiang Yangtze River Tunnel and provides a methodological reference for low-disturbance curtain grouting design in shield docking projects with comparable conditions. Further validation across different geological and hydraulic environments is required before the proposed parameters can be generalized.