ICT Implementation for Materials Management in Construction Projects: Case Studies Construction Projects;Construction Materials;Materials Managements;ICT; Construction materials usually constitute a major portion of the total cost in a building construction project. Materials management Is made problematic by materials shortages, delays in supply, price fluctuations, damage and wastage, and lack of storage space. Despite the potential benefit of ICT, convincing construction organisations to embrace its use and implementation has proved a difficult task. This study seeks to identify the implementation of ICT for materials management processes in construction projects. The findings from the case studies reveal that the implementation of ICT in the materials management processes for construction projects in Malaysia Is at early stage. Microsoft Excel Spreadsheet and handheld devices are found to be the common ICT tools adopted in the materials management processes. The main barrier is found to be the cost involvement at the initial stage or overall implementation of ICT in the materials management processes. Finally, this paper concludes the finding from interviews towards the ICT implementation of materials management in the construction projects.
Wind-induced loads and motions play a critical role in designing tall buildings and their lateral structural systems. Building configuration represented by its outer shape is a key parameter in determining these loads and structural responses. However, contemporary architecture trends towards creating taller buildings with more complex geometrical shapes to offer unique designs that become a signature on the map of the world. As a result, evaluating wind-induced motions on such structures becomes more challenging to be evaluated and predicted. This paper presents a computational performance-based aerodynamic optimization with minor imposed modifications that have little to no impact on architectural and structural design intent. The developed tool aims to assist both architects and engineers to seek a sustainable optimal design decision at the early stage of design by employing different computational technological tools in an automated manner. A computational optimization methodology consisting of a computational fluid dynamic coupled with finite element analysis and embedded within a radial basis function surrogate model is proposed to mitigate wind-induced loads on tall buildings. In addition, a numerical example implementing the proposed methodology on selected case study is presented and discussed. The proposed approach was able to achieve a minimization of 13.83% and 23.12% for along-wind and across-wind loads, respectively, which is translated to a reduction in structural response by 12.95% and 14.31% in maximum deflection for along-wind and across-wind directions, respectively.
The growing consumption of natural resources to meet the needs of road construction has become a significant challenge to environmental sustainability. Additionally, the increase in industrial by-products has raised global concerns due to their environmental impacts. The utilization of industrial by-products in asphalt mixtures offers an effective solution for promoting sustainable practices. The objective of this article is to conduct a bibliometric analysis and citation-based review to characterize and analyze the scientific literature on the use of steel slag aggregates, copper slag, phosphorus slag, bottom ash, fly ash, red mud, silica fume, and foundry sand in asphalt mixtures. Another aim is to identify research gaps and propose recommendations for future studies. The bibliometric analysis was conducted using VOSviewer software version 1.6.18, focusing on authors, co-authorship, bibliographic coupling, and countries. A total of 909 articles were selected for the bibliometric analysis. The findings indicate that more effort is needed to expand the application of industrial by-products in asphalt mixtures. Furthermore, these by-products should be utilized in different types of asphalt mixtures. The incorporation of industrial by-products into asphalt mixes also requires field validation and further laboratory investigations, particularly concerning aging and moisture resistance. In addition, the effects of chemical reactions involving industrial by-products on the long-term performance of asphalt layers should be evaluated. Finally, this article encourages engineers and researchers to intensify their efforts in utilizing industrial by-products for environmental sustainability.
1 December 2017 in Management and Production Engineering Review
Construction projects are more often than not plagued by poor performances such as delays, cost overrun, low productivity, construction wastes and compromised quality. Amongst the critical contributory factors of poor project performances, is the ineffectiveness of materials management occurring in the construction sites. Indeed, materials management is a very important component for construction projects. However, there are only limited numbers of research available regarding this topic. Thus, this research focuses its study on materials management, specifically in identifying the influential factors that affect materials management in the construction project activities. Literatures from books, journal articles and conference papers related to poor project performances and materials management have been reviewed. Consequently, this study sorted the salient influential factors and categorized them based on their specific group. Out of 47 factors identified, they are classified into 8 groups. They are (1) site condition; (2) planning and handling on site; (3) management; (4) materials; (5) supplier and manufacturer default; (6) transportation; (7) contractual; and (8) governmental interferences. In conclusion, this study contends that by identifying the influential factors affecting materials management, it will help construction players to avoid the occurrence of those factors and will minimize the negative impacts on the overall performance of construction projects. Hence, the handling-over of project will be according to schedule and not delayed by materials mismanagement.
1 November 2017 in IOP Conference Series: Materials Science and Engineering