Mussin Aibek

Mussin Aibek


Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
30 March 2023 in Mining of Mineral Deposits
Verified
Journal Article
Closed access
MAMussin Aibek
Mussin Aibek
AIAskar Imashev
Askar Imashev
AMAzamat Matayev
Azamat Matayev
YAYerkebulan Abeuov
Yerkebulan Abeuov
NSNurlan Shaike
Nurlan Shaike
AKAidar Ermekkalievish Kuttybayev
Aidar Ermekkalievish Kuttybayev
Purpose. The research purpose is to study the effectiveness of artificial maintenance of the mined-out space based on the use of cable bolts to reduce the dilution coefficient when mining low-thickness ore bodies. Methods. Geotechnical mapping of the rock mass according to the Q, RMR, RQD and GSI rating classifications is conducted, as well as a linear survey of the fracture system in the hanging wall and footwall rocks is performed using a rock compass and the GEO ID application. Numerical analysis by the limit equilibrium method in the Unwedge software package is applied to determine the safety factor of a mass divided by fractures into wedges. Using a Schmidt test hammer, the uniaxial compressive strength of the mass rocks has been determined. The full-scale studies have been conducted using cable support in the conditions of the Akbakai deposit. Findings. It has been revealed that the footwall rocks are in a stable state, while the safety factor of the hanging wall rocks is 0.98, which requires artificial maintenance using cable bolts. The cable support parameters are calculated taking into account nonuniform distribution of horizontal and vertical stresses in the rock mass. It has been determined that when strengthening the hanging wall with cable bolts in inclined veins with a dip angle of up to 40º, the average ore dilution is 66.1%, and that of previously mined without fastening is 68.7%. In similar experiments in steep-dipping veins with a dip angle of more than 60º, dilution decreases from 62.8 to 48.7%. Originality. It has been revealed that in the conditions of the Akbakai deposit, cable fastening of the hanging wall rocks is effective at an ore deposit dip angle of more than 60º, at which the mined ore dilution coefficient decreases. Practical implications. The research results can be used to increase the stability of hanging wall rocks when mining low-thickness ore bodies with a sublevel caving system.

1 September 2021 in Mining of Mineral Deposits
Verified
Journal Article
Closed access
AMAzamat Matayev
Azamat Matayev
АААрстанбек Абдиев
Арстанбек Абдиев
AKAdilzhan Kydrashov
Adilzhan Kydrashov
MAMussin Aibek
Mussin Aibek
NKNatalia Khvatina
Natalia Khvatina
Dinara KaumetovaDinara Kaumetova
Dinara Kaumetova
Purpose.Determination of the rock stability along the strike of the mass, where the drift mining of the horizon -480 m is conducted, considering the possibility of using the improved types of supports in the conditions of the 10th Anniversary of Kazakhstan’s Independence mine at the Khromtau field with the substantiation of using the effective type of fastening that increases technical and technological, operational and economic indicators of the mine. Methods. Numerical modelling of the stress-strain state of the rock mass applied at the mine have been performed using the RS2 software in a two-dimensional formulation. The rock mass state, as well as the physical-mechanical properties of mine rocks are determined according to building codes and regulations (SNiP II-94-80), depending on the category of the rock stability. Findings. It has been revealed that the combined supports from rock bolts and shotcrete are the most rational type of fastening in the studied mine. The efficiency and prospects of using the combined supports have been determined, which ensure a decrease in their material consumption and cost while increasing the reliability of mine workings and the labor productivity of miners. The use of combined support allows to increase the economy of materials for support by 1.7 times, as well as to increase the drifting rate by 1.6 times in comparison with the metal support. Originality.The paper proposes a new approach to substantiation of an effective fastening method by comparing the costs when driving horizontal underground mine workings in the mining-and-geological conditions of the 10th Anniversary of Kazakhstan’s Independence mine. Practical implications.The research results can be used when planning mining operations, in particular, stable fastening methods at the 10th Anniversary of Kazakhstan’s Independence mine of the Khromtay deposit, as well as other mining enterprises with similar mining-and-geological conditions.

1 September 2024 in Civil Engineering Journal
Verified
Journal Article
Open access
PDF file
SZSh. Zeitinova
Sh. Zeitinova
AIAskar Imashev
Askar Imashev
NBN. Bakhtybayev
N. Bakhtybayev
AMA. Matayev
A. Matayev
MAMussin Aibek
Mussin Aibek
GYG. Yeskenova
G. Yeskenova
In recent years, the development of the mining industry in the Republic of Kazakhstan has been accompanied by the commissioning of new underground levels for many existing mineral deposits, which were initially developed through open-pit mining. As the depth of open-pit mining increases, the volume of overburden rises sharply, making open-pit mining unprofitable due to the significant amount of additional mining work required. For this reason, most open-pit mines in Kazakhstan are transitioning to underground mining, or combined mining. Many researchers have examined the timing of this transition and have worked on optimizing it to determine the best economic efficiency and manage risks. However, there is limited information available on how to determine the optimal location for a vertical mine shaft when transitioning from open-pit to underground mining. The purpose of this study is to identify a safe location for a vertical shaft in combined mining operations. Specifically, the study assesses the impact of the open-pit mine on the selection of the mine shaft’s location, considering the stress-strain state of the rock mass during combined mining methods. To address these objectives, numerical modeling of the stress-strain state around vertical excavations during combined mining was performed. The results provide a solution to the critical issue of determining the location of the mine shaft in combined geotechnology and lay the groundwork for further research on shaft placement in Kazakhstan. The novelty of this study lies in identifying the shaft location by considering the geometric shape of the open-pit mine and the depth of development. Doi: 10.28991/CEJ-2024-010-09-010 Full Text: PDF

9 December 2024 in Applied Sciences
Verified
Journal Article
Open access
PDF file
AIAskar Imashev
Askar Imashev
MAMussin Aibek
Mussin Aibek
AAAmoussou Adoko
Amoussou Adoko
When excavating tunnels and underground openings with the drill-and-blast method, minimizing excavation overbreak is vital, as it reduces the costs associated with excavation stability, mucking, and rock support. Overbreak in excavations not only causes safety concerns but also increases the cost of construction and completion time. This paper proposes a contour blasting design in which the parameters are optimized based on the rock’s structural properties. Numerical modeling was used to identify the possible damage zones of rock with a change of the seismic load due to blasting. The results were used as input for the design of the proposed contour blasting with a low-brisance explosive. Experimental blasting tests were conducted at the Akbakai mine, located in Kazakhstan, and the performance of the design was examined. The proposed contour blasting was compared with the standard blasting method. The results indicated that the cross-section of excavation with the conventional blasting method varied between 10.5 and 12.1 m2, indicating an overbreak between 17 and 34%. However, with the suggested contour blasting, the overbreak was less than 13%. It was concluded that charging contour boreholes with low-brisance explosives is an effective method of reducing overbreak due to excessive explosive loads on the contour massif, which can improve the safety and profitability of mining operations.

1 January 2021 in Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu
Verified
Journal Article
Closed access
AMA.K Matayev
A.K Matayev
Vasyl LozynskyiVasyl Lozynskyi
Vasyl Lozynskyi
MAMussin Aibek
Mussin Aibek
RAR.M Abdrashev
R.M Abdrashev
AKA.S Kuantay
A.S Kuantay
AKAlmira Kuandykova
Almira Kuandykova
Purpose. Predicting the formation of a stress-strain state (SSS) in the rock mass within the boundaries of influence of stope operations on the horizon -480 m in axes 2028 at the 10th Anniversary of Kazakhstans Independence (DNK) Mine. Methodology. An engineering-geological data on the host rocks properties are analyzed based on the international ISRM standard. Numerical modelling of the rock mass stress-strain state and the calculation of the load-bearing capacity of the compound support (roof-bolt+shotcrete+mesh) and arch support used at the mine are performed with the help of the RS2 software. This program, based on the Finite Element Method in a two-dimensional formulation, makes it possible to take into account a significant number of factors influencing the rock mass state. Findings. The calculations performed indicate that the support resistance is incommensurably low in comparison with the values of the initial stress field components in the rock mass. In such conditions, it may be more effective to strengthen the mass in the vicinity of mine working than setting more frames or using more massive support profiles. Originality. The paper presents the results of mathematical modeling and calculation of the stress-strain state of the underground supporting aquifer rock mass structures developed for complex mining-and-geological and geomechanical conditions of driving, supporting and operating mine workings on deep horizons of the mines at Donskoy Ore Mining and Processing Plant. Based on the performed research, the preliminary (advanced) strengthening of the border rock mass in the zone of inelastic (destructive) deformations has been substantiated, as a priority method to control the stability of mine workings. Practical value. The research results can be used when creating a geomechanical model of the field and designing stable parameters of mine working support.

30 September 2022 in Mining of Mineral Deposits
Verified
Journal Article
Closed access
AIAskar Imashev
Askar Imashev
ASAigerim Suimbayeva
Aigerim Suimbayeva
GZGaukhar Zhunusbekova
Gaukhar Zhunusbekova
SZSholpan Zeitinova
Sholpan Zeitinova
AKAidar Ermekkalievish Kuttybayev
Aidar Ermekkalievish Kuttybayev
MAMussin Aibek
Mussin Aibek
Purpose. Studying the stress-strain state of the rock mass under the open pit, taking into account the change in the open-pit bottom width in order to reveal the geomechanical state and determine the safe parameters of the rock bridge. Methods. The peculiarities of the stress-strain state formation in the transition zone have been studied according to the methodology using numerical research methods and taking into account the geological strength index (GSI). Using this index, it is possible to take into account rock fracturing, water cut, lithology and other strength indicators, due to which there is a correct transition from the rock sample strength to the mass strength. Findings. Based on the numerical modeling results, it has been determined that an increase in the open-pit bottom width leads to a decrease in the zone of tensile stresses concentration in the arch pillar of the stope block. This, in turn, has a positive effect on the rock bridge stability, that is, the probability of the rock bridge collapse does not increase with an increase in the width of the open-pit bottom. Originality. For the first time, the dependence has been obtained of the horizontal stresses σ3 distribution at the stages of the open-pit bottom expansion at the Akzhal Zinc-Lead Mine. This makes it possible to realistically predict changes in the geomechanical state of the rock bridge depending on the width of the open-pit bottom. Practical implications. When predicting the change in the stress-strain state in the transition zone and determining the rock bridge safe parameters, it is possible to reduce the probability of their destruction and make timely management decisions on safe conditions for mining the reserves.