Aidar Ermekkalievish Kuttybayev

Dr. Aidar Ermekkalievish Kuttybayev

Горное дело, Satbayev University, Almaty, Kazakhstan

Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
30 March 2023 in Mining of Mineral Deposits
Verified
Journal Article
Closed access
MAMussin Aibek
Mussin Aibek
AIAskar Imashev
Askar Imashev
AMAzamat Matayev
Azamat Matayev
YAYerkebulan Abeuov
Yerkebulan Abeuov
NSNurlan Shaike
Nurlan Shaike
AKAidar Ermekkalievish Kuttybayev
Aidar Ermekkalievish Kuttybayev
Purpose. The research purpose is to study the effectiveness of artificial maintenance of the mined-out space based on the use of cable bolts to reduce the dilution coefficient when mining low-thickness ore bodies. Methods. Geotechnical mapping of the rock mass according to the Q, RMR, RQD and GSI rating classifications is conducted, as well as a linear survey of the fracture system in the hanging wall and footwall rocks is performed using a rock compass and the GEO ID application. Numerical analysis by the limit equilibrium method in the Unwedge software package is applied to determine the safety factor of a mass divided by fractures into wedges. Using a Schmidt test hammer, the uniaxial compressive strength of the mass rocks has been determined. The full-scale studies have been conducted using cable support in the conditions of the Akbakai deposit. Findings. It has been revealed that the footwall rocks are in a stable state, while the safety factor of the hanging wall rocks is 0.98, which requires artificial maintenance using cable bolts. The cable support parameters are calculated taking into account nonuniform distribution of horizontal and vertical stresses in the rock mass. It has been determined that when strengthening the hanging wall with cable bolts in inclined veins with a dip angle of up to 40º, the average ore dilution is 66.1%, and that of previously mined without fastening is 68.7%. In similar experiments in steep-dipping veins with a dip angle of more than 60º, dilution decreases from 62.8 to 48.7%. Originality. It has been revealed that in the conditions of the Akbakai deposit, cable fastening of the hanging wall rocks is effective at an ore deposit dip angle of more than 60º, at which the mined ore dilution coefficient decreases. Practical implications. The research results can be used to increase the stability of hanging wall rocks when mining low-thickness ore bodies with a sublevel caving system.

30 June 2016 in Mining of Mineral Deposits
Verified
Journal Article
Open access
NUNational Mining University
National Mining University
OKO Kovrov
O Kovrov
KBK Babiy
K Babiy
IUInstitute of Geotechnical Mechanics named after M.S Polyakov of the National Academy of Sciences of Ukraine
Institute of Geotechnical Mechanics named after M.S Polyakov of the National Academy of Sciences of Ukraine
BRB Rakishev
B Rakishev
AKAidar Ermekkalievish Kuttybayev
Aidar Ermekkalievish Kuttybayev

3 April 2023 in Machines
Verified
Journal Article
Open access
PDF file
BRBoranbay Ratov
Boranbay Ratov
Miroslaw RuckiMiroslaw Rucki
Miroslaw Rucki
BFBoris Fedorov
Boris Fedorov
Edwin Spartak GevorkyanEdwin Spartak Gevorkyan
Edwin Spartak Gevorkyan
ZSZbigniew Siemiątkowski
Zbigniew Siemiątkowski
NBNikolai Bondarenko
Nikolai Bondarenko
The paper is dedicated to the enhancement of Polycrystalline Diamond Bits (PDC) designed for oil and gas industry. A novel diamond-reinforced composite was applied for cutting inserts, with the addition of 4 wt% chromium diboride to the WC-Co matrix. The addition of CrB2 ensured improvement of bending strength and fracture toughness by nearly 30% and 40%, respectively, and enhanced the diamond retention force. The efficiency of PDC bits was further improved by incorporating constructional features in both bottomhole and reaming parts. An analytical relationship between the feeding speed and geometrical parameters was found, including the wings and calibrating inserts numbers, as well as the rotational speed of the cutter. Under the conditions of rock fracture by reaming inserts, the approximate value of the required power was calculated.

14 February 2022 in Series of Geology and Technical Sciences
Verified
Journal Article
Closed access
ABA. Bolatova
A. Bolatova
AKAidar Ermekkalievish Kuttybayev
Aidar Ermekkalievish Kuttybayev

29 December 2025 in Technology audit and production reserves
Verified
Journal Article
Open access
Nurzhigit SmailovNurzhigit Smailov
Nurzhigit Smailov
YNYerzhan Nussupov
Yerzhan Nussupov
KTKyrmyzy Taissariyeva
Kyrmyzy Taissariyeva
AKAidar Ermekkalievish Kuttybayev
Aidar Ermekkalievish Kuttybayev
MBMoldir Baigulbayeva
Moldir Baigulbayeva
SLSerhii Lutsenko
Serhii Lutsenko
The object of the research is the developed automated computational model (AI-driven system) for real-time monitoring and analysis of road traffic, focusing on the identification and assessment of dangerous situations (traffic violations, congestion, and accident risks). This paper examines how the increased number of people moving to cities and their vehicles increases the likelihood of traffic accidents on public roads. It is also noted that traditional inspections are carried out very slowly and do not fully detect violations of traffic rules. To overcome these limitations, it is proposed a novel automated computational model for vehicle and accident tracking, based on UAVs combined with computer vision and artificial intelligence technologies. The proposed model allows for real-time threat detection and evaluation. The study, modeled in the MATLAB environment using real traffic data from drone-captured video. This model demonstrates significant improvements in operational metrics, an average detection achieved accuracy 89% for vehicles and critical events (e. g., congestion, deviations). The model successfully visualizes risk areas with heat maps and predicts short-term traffic pattern changes, increasing the reliability of traffic management and expanding the possibilities of traffic risk forecasting. The results obtained during the simulation can be used in practice by transport services, road, and maintenance organizations, particularly at difficult intersections and on highly accident-prone highways in urban, heavily built-up areas.

30 September 2022 in Mining of Mineral Deposits
Verified
Journal Article
Closed access
AIAskar Imashev
Askar Imashev
ASAigerim Suimbayeva
Aigerim Suimbayeva
GZGaukhar Zhunusbekova
Gaukhar Zhunusbekova
SZSholpan Zeitinova
Sholpan Zeitinova
AKAidar Ermekkalievish Kuttybayev
Aidar Ermekkalievish Kuttybayev
MAMussin Aibek
Mussin Aibek
Purpose. Studying the stress-strain state of the rock mass under the open pit, taking into account the change in the open-pit bottom width in order to reveal the geomechanical state and determine the safe parameters of the rock bridge. Methods. The peculiarities of the stress-strain state formation in the transition zone have been studied according to the methodology using numerical research methods and taking into account the geological strength index (GSI). Using this index, it is possible to take into account rock fracturing, water cut, lithology and other strength indicators, due to which there is a correct transition from the rock sample strength to the mass strength. Findings. Based on the numerical modeling results, it has been determined that an increase in the open-pit bottom width leads to a decrease in the zone of tensile stresses concentration in the arch pillar of the stope block. This, in turn, has a positive effect on the rock bridge stability, that is, the probability of the rock bridge collapse does not increase with an increase in the width of the open-pit bottom. Originality. For the first time, the dependence has been obtained of the horizontal stresses σ3 distribution at the stages of the open-pit bottom expansion at the Akzhal Zinc-Lead Mine. This makes it possible to realistically predict changes in the geomechanical state of the rock bridge depending on the width of the open-pit bottom. Practical implications. When predicting the change in the stress-strain state in the transition zone and determining the rock bridge safe parameters, it is possible to reduce the probability of their destruction and make timely management decisions on safe conditions for mining the reserves.