Anna Luiza Madureira Batista

Ms. Anna Luiza Madureira Batista

orcid

Research Focus & Metrics

Academic Career Length

2Years (2025-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
4 July 2025 in Mining
Verified
Journal Article
Open access
PDF file
Jordan Johnny SilvaJordan Johnny Silva
Jordan Johnny Silva
ABAnna Luiza Madureira Batista
Anna Luiza Madureira Batista
ASAugusto Y. C. Santos
Augusto Y. C. Santos
Leonardo Junior Fernandes CamposLeonardo Junior Fernandes Campos
Leonardo Junior Fernandes Campos
Pedro Henrique Alves CamposPedro Henrique Alves Campos
Pedro Henrique Alves Campos
Douglas MazzinghyDouglas Mazzinghy
Douglas Mazzinghy
Geometallurgy is an approach that utilizes predictive models that can support business decisions, mitigate risks, and enhance production efficiency. To develop an accurate geometallurgical model, it is essential to understand the behavior of each lithology within the ore body through geometallurgical testing. In this context, the present study aims to evaluate the performance of bench-scale tests conducted on the main mining fronts of a zinc mine operation located in Brazil. The mineral processing plant was designed to process lead and zinc sulfide ores without material stockpiling, where all ores extracted from the underground mine are immediately processed. The geometallurgical characterization was conducted through the following steps: sampling, crushing, grinding, and flotation. The recovery, concentrate, and tailing contents during the flotation stages of galena and sphalerite were analyzed. A mineralogical characterization using a Mineral Liberation Analyzer (MLA) was performed to assess the degree of particle liberation and mineral associations within the studied mining fronts. The results indicate that a higher degree of pyrite liberation leads to greater metallurgical recovery of mineralized bodies A (breccia-hosted orebody), B (sphalerite-rich doloarenite orebody), and C (upper replaced stratiform orebody). Among these, mineralized body C presents the highest recovery in the zinc and lead stages, with 99.5% and 86.2%, respectively.

22 September 2026 in Minerals
Verified
Journal Article
Open access
PDF file
ABAnna Luiza Madureira Batista
Anna Luiza Madureira Batista
LPLucas Pereira
Lucas Pereira
GNGonzalo Nelis
Gonzalo Nelis
Pedro Henrique Alves CamposPedro Henrique Alves Campos
Pedro Henrique Alves Campos
Douglas MazzinghyDouglas Mazzinghy
Douglas Mazzinghy
Geometallurgy provides a framework for incorporating the spatial variability of ore processing responses into mine planning, although its practical implementation in operating mines remains limited due to the scarcity of dedicated metallurgical datasets. This study presents a case study using real operational data from the Salobo copper–gold mine and aims to evaluate how geometallurgical variables can be integrated into long-term mine planning using a limited geometallurgical dataset. Predictive models for Cu metallurgical recovery, Cu concentrate grade, and specific energy were developed from drillhole samples originally collected for resource evaluation. These models were incorporated into a Direct Block Scheduling framework through the formulation of block economic values, enabling the representation of processing-related variability within mine planning decisions. Two planning scenarios were evaluated: the Geomet scenario, which incorporates geometallurgical variables into block economic value without explicit operational time restrictions, and the Geomet_Constraints scenario, which additionally includes an explicit annual processing time constraint based on plant capacity. Although the predictive models exhibited low-to-moderate predictive performance (R2 = 0.45–0.60), their predictions were incorporated into the block model to represent the estimated spatial variability of processing responses. The results show that the Geomet_Constraints scenario generates operationally feasible schedules that comply with plant processing capacity and reduce overall material movement and stockpiling. In contrast, the Geomet scenario results in higher material movement and processing requirements exceeding plant capacity. From an economic perspective, the Geomet_Constraints scenario achieves a slightly higher cumulative NPV (approximately +2.8%), although this difference should be interpreted in the context of the predictive performance of the geometallurgical models. Overall, this case study illustrates how geometallurgical information can be incorporated into a long-term mine planning framework using a limited real-world dataset, and that the inclusion of processing time constraints plays a key role in improving the operational feasibility and economic performance of long-term production schedules.