Honghu Yuan

Honghu Yuan

Auto-generated profile, based on publicly available information

Honghu Yuan

Guangdong Provincial Key Laboratory of Deep Earth Sciences and Geothermal Energy Exploitation and Utilization, Institute of Deep Earth Sciences and Green Energy, College of Civil and Transportation Engineering Shenzhen University Shenzhen China

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
13 December 2018 in Arabian Journal of Geosciences
Verified
Journal Article
Closed access
PDF file
HYHong-Hu Yuan
Hong-Hu Yuan
RSRen-Liang Shan
Ren-Liang Shan
XSXue-Gui Su
Xue-Gui Su

20 January 2023 in Energy Science & Engineering
Verified
Journal Article
Open access
YWYingwei Wang
Yingwei Wang
HYHonghu Yuan
Honghu Yuan
MGMingzhong Gao
Mingzhong Gao
MLMinghui Li
Minghui Li
JSJingge Sun
Jingge Sun
To study the fracture law of different overlying strata during mining of the lower protective seam under a close distance coal seam at a depth of 1000 m, roof bed‐separation and fissure imaging monitoring were carried out in the inlet roadway ahead of the working face of the JI15‐31040 lower protective seam in the Pingdingshan XII coal mine. The results show that with the overlying strata of the lower protective seam being affected by mining, the displacement of the overlying strata in the roof of 0–4 m was relatively large, and the fissure development was very significant. The displacement of the overlying strata in the roof of 4–12 m was relatively small, the fissures in this range were mostly randomly closed fissures, and this area was stable. Bed separation occurred in the roof of 12–16 m, and the bed‐separating fissures were mostly located at the coal–rock junction. During the mining process, the fractal dimension of the roof gradually increased, and the fissure network developed continuously. The changing process of the fractal dimension of the roof can be roughly divided into three typical change areas: less influence area (distance from the working face > 70 m), rapid increase area (15 m < distance from the working face < 70 m), and stable area (distance from the working face < 15 m), and the area within 70 m in front of the working face was the key supporting area. Under the influence of mining, the roof fissures showed an overall change trend of “from zero to some, from short to long, from small to large, and from narrow to wide.” This study can provide a reference for mining of the protective seam in deep coal seams.

12 January 2021 in Journal of Asian Architecture and Building Engineering
Verified
Journal Article
Open access
RSRenliang Shan
Renliang Shan
Pengcheng HuangPengcheng Huang
Pengcheng Huang
HYHonghu Yuan
Honghu Yuan
CMChi Meng
Chi Meng
SZShupeng Zhang
Shupeng Zhang
Anchor cables often break in various forms. Tensile failure can be resisted by using high-strength materials, while there is no good solution for shear failure. A new supporting structure called Anchor Cable and C-shaped tube that can bear the transverse shear force was invented and a preliminary introduction to the mechanism of the structure is given. Field investigations and in-situ stress tests were carried out on the panel 3210 in the Nanguan Mine. The failure modes of the surrounding rock and cables and the in-situ stress test results show that the working face is obviously affected by the horizontal stress. Thus, a new full-section anchor cable and C-shaped tube support scheme were proposed. The results of FLAC3D show that the new scheme is excellent in controlling the surface convergence and plastic zone extension. The rationality of the scheme was verified by two-and-a-half months of monitoring. Compared with the original scheme, the amount of surface displacement was at least 20% smaller, and the time for the displacement to reach equilibrium was at least 27.4% shorter. The surface of the roadway is flat without supporting material damaging. The new scheme is worth popularizing in similar working conditions.

1 December 2020 in Theoretical and Applied Fracture Mechanics
Verified
Journal Article
Closed access
HYH. Yuan
H. Yuan
YXYu Xie
Yu Xie

23 June 2021 in E3S Web of Conferences
Verified
Conference Paper
Open access
PDF file
HYHong-Hu Yuan
Hong-Hu Yuan
LKLiao Kun
Liao Kun
YWYu Wang
Yu Wang
There is a large amount of backfilled earth on both sides of the wall and the top of the lower wall of the Daning Reservoir’s cutoff wall, which is greatly disturbed by the project, and the safety of the cutoff wall needs to be evaluated. Based on the deformation law and stress condition of rigid cutoff wall during construction, according to the connection characteristics of rigid cutoff wall and plastic cutoff wall structure, the stress analysis of rigid cutoff wall is carried out by using field measurement data, so as to deduce the deformation law of plastic cutoff wall underneath, and evaluate the safety of plastic cutoff wall. The results show that the plastic cutoff wall is mainly affected by compressive stress, and the maximum compressive stress is far less than the allowable compressive stress, which indicates that the plastic cutoff wall is safe and stable during the whole construction period, although it is affected by construction and rigid cutoff wall.