Ali Murat Tanyer

Ali Murat Tanyer

Auto-generated profile, based on publicly available information

Ali Murat Tanyer

Middle East Technical University

Research Focus & Metrics

Academic Career Length

16Years (2011-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 July 2011 in Journal of Computing in Civil Engineering
Verified
Journal Article
Closed access
GFGulsah Fidan
Gulsah Fidan
Irem DikmenIrem Dikmen
Irem Dikmen
ATA. Murat Tanyer
A. Murat Tanyer
TBTalat TALAT Birgonul
Talat TALAT Birgonul
Risk management is about identifying risks, assessing their impacts, and developing mitigation strategies to ensure project success. The difference between the expected and actual project outcomes is usually attributed to risk events and how they are managed throughout the project. Although there are several reference frameworks that explain how risks can be managed in construction projects, a major bottleneck is the lack of a common vocabulary for risk-related concepts. Poor definition of risk and patterns of risk propagation in a project decrease the reliability of risk models that are constructed to simulate project outcomes under different risk occurrence scenarios. This study aims to extend previous studies in risk management by presenting an ontology for relating risk-related concepts to cost overrun. The major idea is that cost overrun depends on causal relations between various risk sources (namely, risk paths) and sources of vulnerability that interfere with these paths. Ontology is used to devel...

1 September 2018 in Journal of Computing in Civil Engineering
Verified
Journal Article
Closed access
FTFatih Topak
Fatih Topak
MPMehmet Koray Pekeriçli
Mehmet Koray Pekeriçli
ATAli Murat Tanyer
Ali Murat Tanyer
Localization in indoor built environments has considerable importance for the architecture, engineering, and construction industry. It has various use cases, including building occupancy detection, automated asset tracking in construction sites, supporting facility maintenance and operations, and guiding people in building emergency response operations. Although some initial studies examining the usability of Bluetooth Low Energy (BLE) for indoor localization exist in the literature, there is still a gap for a comprehensive analysis that will lead to the establishment of a widely accepted BLE-based localization framework. Whereas existing studies mainly focus on radio signal properties and use only spatial accuracy and precision as their evaluation criteria, this study determines the technological viability of BLE through predetermined guidance parameters such as human body orientation, number of data collection points, number of real-time received signal strength index (RSSI) data samples, and fingerprinting creation approaches. In order to determine the viability of BLE-based localization, multiple field experiments are carried out in the building of a research center. Location fingerprinting method is used as the wireless localization technique and the k -nearest neighbor algorithm is used to assess the feasibility of BLE technology for indoor localization. The results of the field experiments show that BLE technology can be used as a reliable solution for indoor localization because it gives better accuracy and precision results than existing approaches in the industry.

5 May 2023 in Renewable and Sustainable Energy Reviews
Verified
Journal Article
Closed access
DYDerya Yılmaz
Derya Yılmaz
ATAli Murat Tanyer
Ali Murat Tanyer
ITİrEm Dikmen Toker
İrEm Dikmen Toker

10 October 2024 in Sustainable Cities and Society
Verified
Journal Article
Closed access
HBHAFIZE BUSRA BOSTANCI
HAFIZE BUSRA BOSTANCI
ATAli Murat Tanyer
Ali Murat Tanyer
GHGuillaume Habert
Guillaume Habert

9 April 2025 in Buildings
Verified
Journal Article
Open access
PDF file
Temitope OmotayoTemitope Omotayo
Temitope Omotayo
ATAli Murat Tanyer
Ali Murat Tanyer
Jiamei DengJiamei Deng
Jiamei Deng
AKAgnes Kaima
Agnes Kaima
AAAnderson Oghenewaro Akponeware
Anderson Oghenewaro Akponeware
Mercy OgunnusiMercy Ogunnusi
Mercy Ogunnusi
The promotion of uptake of building information modelling (BIM) and circular economy (CE) in the UK and Turkiye construction sectors can be enhanced with the addition of AI. Thus, AI-enabled BIM and CE must be addressed from the viewpoint of current practices and capabilities. This study conducted a comparative study of capability maturity modelling (CMM) backed by a state-of-the-art (SOTA) review of 24 peer-reviewed publications via a validatory approach using a focus group webinar of eight experts in the UK and Turkiye. The findings, as extracted through a validated CMM framework of seven dimensions, were used to identify the position of the UK and Turkiye in terms of AI in BIM and CE. It was discovered that the UK is in a position regarding adoption, government policies and incentives at a defined level. AI growth is required in terms of technological advancement, education and training, industry readiness, cultural attitudes and resistance because they are in a managed phase. It was confirmed that Turkiye is at the initial stage of AI adoption, education, training, incentives, policies, technology and cultural attitudes. The originality of this study lies in the recommendations for a 10-year CMM adoption timeframe towards an optimised level. The conclusions of this manuscript will influence government, education, research and technological policies in the UK and Turkiye.

28 July 2023 in International Journal of Construction Management
Verified
Journal Article
Closed access
BOBegum Ongel
Begum Ongel
ATAli Murat Tanyer
Ali Murat Tanyer
IDIrem Dikmen
Irem Dikmen