Harmonic loads and unbalanced loading in a distribution transformer lead to higher losses, an increase in temperature which leads to premature failure, and a shorter lifetime. To prevent these difficulties, the rated power of a transformer supplying non-linear loads or unbalanced load is reduced; commonly known as derating. In this paper, an alternative to traditional loss based derating is proposed. It is shown that derating might actually not be required when contrasted with the traditional approach. A perspective is presented on how to make the kVA rating "adaptive" and utilise the same kVA rating with or without harmonics. Actual field data is presented to support this viewpoint.
1 November 2016 in IET Generation, Transmission & Distribution
Steady‐state voltage levels will be a significant problem in the future distribution network due to a high penetration of new technologies, particularly photovoltaics. A smart transformer which incorporates a fixed tap transformer with a power electronic voltage regulator has the potential to mitigate this problem by varying the line voltage automatically in response to changes in loading. This study considers various control strategies for the voltage regulator and looks at the potential impact that a smart transformer could have on reducing system voltage violations. These impact studies are performed on a computer model of an entire utility's distribution system in New Zealand.
1 November 2017 in International Journal of Electrical Power & Energy Systems
The increasing penetration of electric vehicles and distributed generation into distribution networks is giving rise to higher, more volatile and bi-directional energy flows through distribution transformers (DTs). To minimise future capital expenditure, improved DT design approaches are required. Therefore, a novel DT design approach “design for maximum utilisation” is proposed. It incorporates manufacturer and customer-sourced empirical data to achieve a desired DT retirement age and utilisation rate, and allows for transient operation beyond DT nameplate rating through accurately accounting for thermal inertia. Novelty derives not only from a design approach based on maximising DT utilisation, but also allowing for the fact that winding insulation may not be the most critical factor affecting a DT's lifetime. Using the proposed approach DT capital expenditure and utilisation constraints can be optimised at a planning stage. The algorithm is applied and validated.
This paper presents an investigation on the resonant oscillations of an 11 kV layer-type winding transformer under standard and chopped lightning impulse overvoltage conditions based on calculated parameters. The resistances, inductances and capacitances were calculated in order to develop the transformer winding equivalent circuit. The impulse overvoltages were applied to the high voltage (HV) winding and the resonant oscillations were simulated for each of the layers based on different electrostatic shield placement configurations. It is found that the placement of grounded shields between layer 13 and layer 14 results in the highest resonant oscillation and non-linear initial voltage distribution. The oscillation and linear stress distributions are at the lowest for shield placement between the HV and low voltage (LV) windings.
This paper investigates thermal overloading, voltage dips and insulation failure across a distribution transformer (DT), under residential and battery electric vehicle (BEV) loadings. The objective of this paper is to discuss the charging impact of BEVs on voltage across consumer-service points, as well as across the life of paper insulation under varying ambient temperatures (during winter and summer), with and without a centralized battery energy storage system (BESS). This study contributes in two ways. The first part of this study deals with coordinated and uncoordinated BEV charging scenarios. The second part of this study deals with maximum utilization of a test DT rated under dynamic thermal rating (DRoDT). The DRoDT integration with BESS is carried out to flatten the load spikes, to obtain maximum DT utilization, to achieve active power and voltage supports in addition to an enhanced DT lifespan. The obtained results indicate that, when test DT operates under the proposed hybrid technique (combining both dynamic transformer ratings and a centralized BESS), it attains maximum utilization, lower hot-spot temperature, enhanced lifespan, less degraded paper insulation and an improved voltage across each consumer service point. The proposed technique is furthermore found effective in maintaining the loading across the distribution transformer within the nominal limits. However, under excess loading during peak hours, the proposed technique provides relief to the DT to a certain extent. To achieve an optimal DT operation and an enhanced BESS lifespan, the BESS is operated under nominal charging and discharging cyclic limits. Under the proposed DRoDT integration with BESS, DT attains 25.9% more life when loaded with coordinated BEV charging, in comparison to no BESS integration under the same loading scenario. The worst loading due to uncoordinated BEV charging also brings 51% increase in DT life when loaded under the proposed technique.