Lucio Ticona Carrizales

Lucio Ticona Carrizales

Auto-generated profile, based on publicly available information

Lucio Ticona Carrizales

National University of Juliaca, Peru

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
25 October 2020 in Cuestiones Políticas
Verified
Journal Article
Open access
PDF file
CACynthia Milagros Apaza-Panca
Cynthia Milagros Apaza-Panca
JCJohanna Elena Santa Cruz-Arévalo
Johanna Elena Santa Cruz-Arévalo
PMPedro Jesús Maquera-Luque
Pedro Jesús Maquera-Luque
LTLucio Ticona-Carrizales
Lucio Ticona-Carrizales
The objective of the research was to examine and analyze the articles that address public tourism policies in specialized magazines at a global level, with the aim of knowing through comparative public policies, alternative solutions in a post-pandemic scenario. Regarding the methodology, articles were selected whose titles presented one or more keywords that referred to the disease "Covid-19" and "public tourism policies" in Spanish and English. To process the information, the content analysis technique was used. The results showed that the place and space occupied by tourism public policies in the main tourism magazines is scarce and not seen as a management tool for the sector. The conclusion emphasized the lack of clarity regarding the methodology used in the articles and the scarce proposal of public policies that were implemented in situations of health crises, epidemics, wars, etc. For the rest, the following questions served as a guide for the analysis: 1) What is the role of governments in the tourism sector? and, 2) What public policies did governments implement in similar situations such as the current health crisis?

30 June 2023 in REVISTA VERITAS ET SCIENTIA - UPT
Verified
Journal Article
Open access
PDF file
SCSara Copari Condori
Sara Copari Condori
LCLucio Ticona Carrizales
Lucio Ticona Carrizales
VCVaranny Nelyda Ticona Campos
Varanny Nelyda Ticona Campos
SASonia Mamani Aguilar
Sonia Mamani Aguilar
CSCristobal Rufino Yapuchura Saico
Cristobal Rufino Yapuchura Saico
ZVZulema Velásquez Velásquez
Zulema Velásquez Velásquez
La investigación aborda el proceso de ejecución presupuestaria, cuyo objetivo fue medir el nivel de ejecución presupuestal a proyectos de gobiernos locales de la región Puno en los periodos 2019 al 2021, con metodología cuantitativa, no experimental con un diseño de investigación descriptiva de corte transversal aplicado a los 110 gobiernos locales, se utilizó ficha de análisis documental, para identificar el nivel de ejecución de gasto, utilizando el rango del MEF:(84-00=deficiente) (89-85 =regular) (94-85=bueno) (100-95=Muy bueno), el desempeño institucional es calificado según el rango, donde se obtuvo siguiente resultado: el promedio de ejecución de gasto público en proyectos de las municipalidades en periodos 2019 al 2021, es deficiente; se ubica por debajo e igual al 84% de nivel eficiencia de ejecución de presupuesto. En el periodo 2019, el promedio de ejecución de gasto en proyecto es 70.4% al 31 de diciembre, en el 2019, en el periodo 2020 en un 61.2% al 31 de diciembre, en el periodo 2021, en un 73.0% del año fiscal. Pese a la pandemia de COVID 19 tan patente en el año 2020 y 2021 la ejecución de presupuestaria para bienes y servicios en beneficio a la población continua con limitaciones igual al año 2019.

27 May 2022 in REVISTA VERITAS ET SCIENTIA - UPT
Verified
Journal Article
Open access
PDF file
MSMaritza Magdalena Jallo Sanga
Maritza Magdalena Jallo Sanga
LCLucio Ticona Carrizales
Lucio Ticona Carrizales
CACynthia Milagros Apaza-Panca
Cynthia Milagros Apaza-Panca
MCMadeleine Nanny Ticona Condori
Madeleine Nanny Ticona Condori
ICIngrid Rossana Rodríguez Chokewanca
Ingrid Rossana Rodríguez Chokewanca
Considerando lo pertinente a que la asignación de créditos es la principal actividad que llevan a cabo los bancos y, a su vez, es fuente esencial de sus ingresos, de tal manera la morosidad es un tema muy preocupante para una entidad crediticia; es por eso que el objetivo del presente estudio de investigación es identificar y explicar los factores determinantes que influyen en la morosidad crediticia de la localidad de Puno, periodo 2009 al 2019. Para ello se propuso el método deductivo-inductivo y analítico que involucra el tratamiento de las variables de series de tiempo con un modelo econométrico lineal, por mínimos cuadrados ordinarios, en la que nos permitió analizar los determinantes de la morosidad como variable dependiente está siendo explicada significativamente por el PBI, es variable macroeconómica, y variables microeconómicas dentro de la localidad de Puno; y en forma conjunta son significativos, y estas variables van a contribuir a la alta morosidad. Considerando lo pertinente a que la asignación de créditos es la principal actividad que llevan a cabo los bancos y, a su vez, es fuente esencial de sus ingresos

1 May 2021 in Heliyon
Verified
Journal Article
Open access
LCLucio Ticona Carrizales
Lucio Ticona Carrizales
PFPolan Franbalt Ferró-Gonzales
Polan Franbalt Ferró-Gonzales
CACynthia Milagros Apaza-Panca
Cynthia Milagros Apaza-Panca
ESEnrique Gualberto Parillo Sosa
Enrique Gualberto Parillo Sosa
CSCristóbal Rufino Yapuchura Saico
Cristóbal Rufino Yapuchura Saico
ICIngrid Rossana Rodríguez Chokewanca
Ingrid Rossana Rodríguez Chokewanca
The “Espinar” stabilization lagoon is a body of wastewater that is located in the district (region of Puno), which accumulates wastewater that comes from the population of the city of Puno-Peru. The present study was carried out in January and February of 2019 in affluent and effluent wastewater. The measures of pH, water temperature, total suspended solids, electrical conductivity and salinity were evaluated. The results showed that there are significant differences between the data of the affluent and effluent samples during the periods analyzed (Krustal Wallis). The median concentrations values of the effluent for the parameters of temperature (16.60 °C), salinity (0.67 mg/L), pH (7.70), total dissolved solids (669.00 ppm) and electrical conductivity (1463.07 μs/cm), they all show significant differences. Also, the removal efficiency was calculated by the total dissolved solids (TDS) and the positive removal of 7.80% of pollutant load was found. Although these results are within the established limits, the monitoring mechanisms must be established for an adequate control of the parameters evaluated and thus, there won't be a deterioration of the environment surrounding the lagoon.

20 September 2024 in Journal of Ecohumanism
Verified
Journal Article
Open access
PDF file
WAWilson Smith Arpasi-Lima
Wilson Smith Arpasi-Lima
VTVaranny Nelyda Ticona-Campos
Varanny Nelyda Ticona-Campos
OROmar Moisés Rodríguez-Limachi
Omar Moisés Rodríguez-Limachi
CSCristobal Rufino Yapuchura Saico
Cristobal Rufino Yapuchura Saico
DIDuverly Joao Incacutipa-Limachi
Duverly Joao Incacutipa-Limachi
LTLucio Ticona-Carrizales
Lucio Ticona-Carrizales
The objective of this research is to estimate the labor impact of the National Program of direct support to the poorest JUNTOS in Peru for the year 2021. The methodology used is the Propensity Score Matching (PSM) through the nearest neighbor method; the database of the National Household Survey ENAHO 2021 is used as a source of information. The results of the logit model indicate that poverty, unsatisfied basic needs and education do influence the probability of participation in the Juntos Social Program and are statistically significant at a 1% level; the expected signs of the coefficients of the logit model are correct. On the other hand, the effect of the Juntos Social Program on the length of the working day is negative for the year 2021; it is found that the value of the average treatment effect in the treated population (ATT) is -1.167, which is highly significant at a 1% level. This indicates that participation in the Juntos Social Program is associated with an average reduction of 1.167 hours per week in working hours. This suggests that the economic transfer provided by the program is not sufficient to replace the workday, which implies that beneficiaries must continue to participate in the labor field.

16 April 2024 in Revista de Gestão Social e Ambiental
Verified
Journal Article
Open access
PDF file
OROmar Moisés Rodríguez-Limachi
Omar Moisés Rodríguez-Limachi
DIDuverly Joao Incacutipa-Limachi
Duverly Joao Incacutipa-Limachi
LTLucio Ticona-Carrizales
Lucio Ticona-Carrizales
HVHéctor Luciano Velázquez-Sagua
Héctor Luciano Velázquez-Sagua
JPJavier Santos Puma-Llanqui
Javier Santos Puma-Llanqui
AFADDERLY MAMANI FLORES
ADDERLY MAMANI FLORES
Objective: The purpose of the research is to show a specific process to perform the cost/benefit analysis in the social evaluation of public investment projects in the education sector, applying the net present value (NPV) and internal rate of return (IRR) profitability indicators, taking into account that the approach of the National System of Multiannual Programming and Investment Management (Invierte.pe) applies a different methodology as the cost/efficiency analysis, where it uses criteria such as the Present Value of Costs (PVC) and the Cost Efficiency Indicator (CEI). Theoretical framework: In order to present our proposal, we used as a theoretical framework, mainly the directives, instructions, procedures, and methodological guides proposed by the Ministry of Economy and Finance of Peru, which can be improved by considering the results of investment in education. Method: The research proposes a technique to evaluate investment projects in the education sector through the cost/benefit methodology instead of the cost/effectiveness methodology. Within the materials and methods, an education sector investment project approved by Invierte.pe was used, and we added cost/benefit analysis to estimate the profitability indicators NPV and IRR to carry out the social evaluation of the project. Results: The results show that the education project has a net present value of S/. 794,874.30 at social prices, and an internal rate of social return of 9.56%. Finishing the research, it can be concluded based on the results obtained that it is possible to incorporate the cost/benefit methodology in the formulation and evaluation of standard, simplified technical sheets and studies at the profile level of public investment projects in the education sector. Conclusions: It can be concluded that it is feasible the social evaluation of investment projects in the educational sector of the Peruvian state, through the cost/benefit methodology in the region and the country, by means of the profitability indicators NPV and IRR, obtaining a higher internal rate of return. Objetivo : El objetivo de la investigación es mostrar un proceso específico para realizar un análisis de cliente/beneficio en la evaluación social de proyectos de inversión pública en el sector de educación, aplicando los indicadores de rentabilidade valor presente líquido (VPL) y taxa interna de retorno (TIR). ), levando em conta que a abordagem do Sistema Nacional de Programação Plurianual e Gestão de Investimentos (Invierte.pe) aplica una metodología diferente como a análise de custo/eficiência, onde utiliza criterios como o Valor Presente dos Custos (VAC) o Indicador de Eficiencia de Custodia (ICE). Cuadro teórico : o cuadro teórico usado para nuestra propuesta é principalmente como diretrizes, instruções, procedimentos e guias metodológicos propostos pelo Ministério da Economia e Finanças do Peru, que podem ser aprimorados considerando-se os resultados do investimento em educação. Método : A pesquisa propõe uma técnica para disponer de proyectos de inversión en el sector educativo usando a metodologia de custo/benefício em vez da metodologia de custo/eficacia. Dentro de las materias y métodos, foi utilizado un proyecto de inversión en el sector educativo aprobado por Invierte.pe, e acrescentamos a análise de custo/benefício para estimar os indicadores de lucratividade VPL y TIR para realizar avaliação social do projeto. Resultados : Los resultados muestran que el proyecto educativo tiene un valor presente líquido de S/. 794.874,30 a precios sociales y uma taxa interna de retorno social del 9,56%. Al final de la investigación, podemos concluir, con base en los resultados obtenidos, que es posible incorporar una metodología de costumbre/beneficio en la formulación y evaluación de especificaciones técnicas padrón y simplificadas e en estudios de nivel de perfil de proyectos de inversión pública en el sector. educativo. Conclusões : Conclui-se que a avaliação social de projetos de investimento no setor educacional do Estado peruano é viavel, utilizando una metodologia de custo/benefício na região e no país, por meio dos indicadores de rentabilidade VPL e TIR, obteniendo uma taxa interna de retorno más alta.