Joaquin Vaquero

Dr. Joaquin Vaquero

Universidad Rey Juan Carlos, Madrid, Spain
orcid

Research Focus & Metrics

Academic Career Length

25Years (2002-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
14 March 2017 in IEEE Transactions on Industrial Electronics
Verified
Journal Article
Closed access
NVNimrod Vazquez
Nimrod Vazquez
JVJeziel Vázquez
Jeziel Vázquez
Joaquin VaqueroJoaquin Vaquero
Joaquin Vaquero
CHClaudia Hernandez
Claudia Hernandez
EVEsli Vazquez
Esli Vazquez
RORené Osorio
René Osorio
A single-phase common-mode transformerless grid-connected photovoltaic (PV) converter, which is based on the integration of two stages, is proposed in this paper. Transformer elimination in grid-connected PV systems has many advantages. It not only reduces cost, size, and weight but also increases the complete system efficiency. Since there is no galvanic isolation between grid and PV array, a leakage current may appear due to the PV parasitic capacitance to the ground, if this is not taken into account in the converter design. This paper presents a dc/dc boost converter integrated with a full-bridge inverter. The integration of these two stages reduces the ground leakage current. The neutral line of the grid is directly connected to the negative terminal of the PV array, eliminating any possibility of leakage current in this terminal. The principle of operation of the transformerless converter is analyzed, and a 200-W topology is experimentally tested.

13 January 2020 in Energies
Verified
Journal Article
Open access
PDF file
LELeonel Estrada
Leonel Estrada
NVNimrod Vazquez
Nimrod Vazquez
Joaquin VaqueroJoaquin Vaquero
Joaquin Vaquero
Angel De CastroAngel De Castro
Angel De Castro
JAJaime Arau
Jaime Arau
Nowadays, the use of the hardware in the loop (HIL) simulation has gained popularity among researchers all over the world. One of its main applications is the simulation of power electronics converters. However, the equipment designed for this purpose is difficult to acquire for some universities or research centers, so ad-hoc solutions for the implementation of HIL simulation in low-cost hardware for power electronics converters is a novel research topic. However, the information regarding implementation is written at a high technical level and in a specific language that is not easy for non-expert users to understand. In this paper, a systematic methodology using LabVIEW software (LabVIEW 2018) for HIL simulation is shown. A fast and easy implementation of power converter topologies is obtained by means of the differential equations that define each state of the power converter. Five simple steps are considered: designing the converter, modeling the converter, solving the model using a numerical method, programming an off-line simulation of the model using fixed-point representation, and implementing the solution of the model in a Field-Programmable Gate Array (FPGA). This methodology is intended for people with no experience in the use of languages as Very High-Speed Integrated Circuit Hardware Description Language (VHDL) for Real-Time Simulation (RTS) and HIL simulation. In order to prove the methodology’s effectiveness and easiness, two converters were simulated—a buck converter and a three-phase Voltage Source Inverter (VSI)—and compared with the simulation of commercial software (PSIM® v9.0) and a real power converter.

29 February 2016 in IEEE Transactions on Education
Verified
Journal Article
Closed access
Cristina RodriguezCristina Rodriguez
Cristina Rodriguez
ATAngel Torrado-Carvajal
Angel Torrado-Carvajal
Joaquin VaqueroJoaquin Vaquero
Joaquin Vaquero
Susana BorromeoSusana Borromeo
Susana Borromeo
JHJuan A. Hernandez-Tamames
Juan A. Hernandez-Tamames
This paper presents a case study analyzing the advantages and disadvantages of using project-based learning (PBL) combined with collaborative learning (CL) and industry best practices, integrated with information communication technologies, open-source software, and open-source hardware tools, in a specialized microcontroller and embedded systems engineering Master's course. In addition to addressing industry requirements in both contents and methodology, the course develops capabilities and competencies in problem solving, independent learning, teamwork, and technical knowledge. Since PBL methodology alone does not ensure teamwork, it was complemented with CL. Design review meetings (as described in IEC 61160), deliverables, and organizational resources were also introduced to mirror industry demands. This structure integrated course content and student academic achievement in a simulated industrial environment. The course had students build a modular management system for home appliances, implementing control software on the “Arduino” open-source platform, as well as using wireless communications. The results show that teaching, learning, and student assessment processes can be improved by using PBL with CL. In addition, the introduction of industry practices, such us peer review meetings, brings academia closer to a real-world context.

24 November 2020 in IEEE Sensors Journal
Verified
Journal Article
Closed access
JMJesus Morón-López
Jesus Morón-López
Cristina RodriguezCristina Rodriguez
Cristina Rodriguez
FCFrancisco Carreno
Francisco Carreno
Joaquin VaqueroJoaquin Vaquero
Joaquin Vaquero
APAngel G. Pompa-Pernia
Angel G. Pompa-Pernia
JAJuan Antonio Pascual Aguilar
Juan Antonio Pascual Aguilar
The deployment of Remote Monitoring System (RMS) based on Internet of Things (IoT) technologies and data management in the cloud is a cutting-edge solution for water management agencies to track harmful algae blooms (HABs). However, each environment presents different intrinsic characteristics, hence the reliability and representativeness of collected data may vary according to the selected RMS architecture. This study aims to implement the same RMS in two different water bodies in Spain: the freshwater As Conchas reservoir and the shallow L’Albufera brackish water lagoon. We firstly evaluate the pros and cons of current technologies available on the market and then we select an RMS based on a combination of plug-and-play (YSI-based) and customisable solutions (Libelium-based). The deployment of nodes on buoys allows big data collection from different areas of water bodies, their continuous transfer and storage on a web server, and their subsequent visualisation on the web interface in real time. Secondly, in order to know whether the selected RMS architecture and monitored environment influence the representativeness of the collected data, we perform a Pearson correlation test between the deployed nodes and satellite images. The results point out that the more heterogeneous the environment is, the more nodes must be deployed in different areas for a longer time to obtain a realistic view of the water body status. Therefore, this study provides critical and empirical data to implement a profitable and effective real-time monitoring system in other HAB-affected areas.

3 March 2021 in IEEE Transactions on Energy Conversion
Verified
Journal Article
Closed access
LELeonel Estrada
Leonel Estrada
NVNimrod Vazquez
Nimrod Vazquez
Joaquin VaqueroJoaquin Vaquero
Joaquin Vaquero
CHClaudia Hernandez
Claudia Hernandez
JAJaime Arau
Jaime Arau
HHHéctor Huerta
Héctor Huerta
This paper presents a different Finite Control Set – Model Predictive Control (FCS-MPC) for grid-connected three-phase bidirectional power inverters. These are typically used in dc or ac renewable-based microgrids (MGs), where bidirectional operation and fast dynamic response is required. The bidirectional grid-connected inverters are an essential part of MG, which inject energy into the ac grid or demand energy from it. The dynamic behavior of the system is a major concern since the current can suddenly change depending on the hierarchical controller. This paper proposes a different cost function using sliding mode theory, which offers a good dynamic response, reduced computational burden, and a parameter-free control model. The operation principle of the proposed controller is given and evaluated using a Hardware-In-the-Loop (HIL) system, but also experimentally with a 1kW laboratory prototype. The final results demonstrate the advantages of using this approach in grid-connected three-phase bidirectional power inverters in terms of dynamic response and reduced computational burden, making this solution technically attractive and viable.

29 January 2020 in International Journal of Photoenergy
Verified
Journal Article
Open access
PDF file
IMIgnacio Villanueva Martínez
Ignacio Villanueva Martínez
NVNimrod Vazquez
Nimrod Vazquez
Joaquin VaqueroJoaquin Vaquero
Joaquin Vaquero
CHClaudia Hernández
Claudia Hernández
HLHéctor López
Héctor López
RORené Osorio
René Osorio
The increasing use of photovoltaic systems entails the use of new technologies to improve the efficiency and power quality of the grid. System performance is constantly increasing, but its reliability decreases due to factors such as the uncontrolled operation, the quality of the design and quantity of components, and the use of nonlinear loads that may lead to distortion in the signal, which directly affects the life of the system globally. This article presents an analysis of the reliability of a single-phase full-bridge inverter for active power injection into the grid, which considers the inverter stage with its coupling stage. A comparison between an L filter and an LCL filter, which comprise the coupling stage, is made. Reliability prediction is based on metrics, failure rate, mean time between failures, and total harmonic distortion. The analysis and numerical simulation are performed. Finally, filter considerations are suggested to extend the reliability of the inverter in a photovoltaic system.