Yasir Basheer

Mr. Yasir Basheer

Electrical Engineering, Riphah International University, Islamabad, Islāmābād, Pakistan
+1
orcid

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
27 February 2023 in Energies
Verified
Journal Article
Open access
PDF file
Moez KrichenMoez Krichen
Moez Krichen
Yasir BasheerYasir Basheer
Yasir Basheer
Saeed Mian QaisarSaeed Mian Qaisar
Saeed Mian Qaisar
AWAsad Waqar
Asad Waqar
Intermittent renewable energy is becoming increasingly popular, as storing stationary and mobile energy remains a critical focus of attention. Although electricity cannot be stored on any scale, it can be converted to other kinds of energies that can be stored and then reconverted to electricity on demand. Such energy storage systems can be based on batteries, supercapacitors, flywheels, thermal modules, compressed air, and hydro storage. This survey article explores several aspects of energy storage. First, we define the primary difficulties and goals associated with energy storage. Second, we discuss several strategies employed for energy storage and the criteria used to identify the most appropriate technology. In addition, we address the current issues and limitations of energy storage approaches. Third, we shed light on the battery technologies, which are most frequently used in a wide range of applications for energy storage. The usage and types of batteries are described alongside their market shares and social and environmental aspects. Moreover, the recent advances in battery state estimation and cell-balancing mechanisms are reviewed.

29 September 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
Yasir BasheerYasir Basheer
Yasir Basheer
AWAsad Waqar
Asad Waqar
Saeed Mian QaisarSaeed Mian Qaisar
Saeed Mian Qaisar
TAToqeer Ahmed
Toqeer Ahmed
NUNasim Ullah
Nasim Ullah
SASattam Alotaibi
Sattam Alotaibi
Cement manufacturing is one of the most energy-intensive industries in the world. Most of the cost of producing cement is accounted for in terms of fuel consumption and power expenditure. Thermal power plants are a significant contributor to electricity generation in countries such as Pakistan. They are, however, inherently inefficient, and environmentally unfriendly. In this paper, the authors investigated the possibility of delivering hybrid energy to Pakistani cement plants. Five cement plants—Askari Cement Plant, Wah (ACPW); Bestway Cement Plant, Kalar Kahar (BCPKK); Bestway Cement Plant, Farooqia (BCPF); Bestway Cement Plant, Hattar (BCPH); and DG Cement Plant, Chakwal (DGCPC)—were selected. The possibility of implementing the four off-grid hybrid energy models (HEMs) was investigated for the intended cement plants, using HOMER Pro software. A multi-criteria decision analysis (MCDA) was carried out, based on objectives including the net present cost (NPC), the levelized cost of electricity (LCOE), and greenhouse gas (GHG) emissions. HEM-1 was comprised of PV, converter, and a fuel cell. HEM-2 had only a diesel generator, and acted as a base case in this study. HEM-3 had solar panels and a battery-converter system. In HEM-4, diesel generators, PV, and converters were considered. Based on the NPC, the optimal model was HEM-4, having a 0.249 USD/KWh LCOE in islanded systems. The NPC and operating costs were USD 540 M and USD 32.5 M per year, respectively, with a 29.80% reduction in the CO2 emissions compared to the base case. Based on the GHG emission, HEM-1 and HEM-3 were the best models, with 0% GHG emissions. The results confirmed that the proposed HEMs can sustainably provide electricity for 24 h a day to the sites under consideration, with minimum objectives.

31 July 2023 in IEEE Access
Verified
Journal Article
Open access
Yasir BasheerYasir Basheer
Yasir Basheer
Saeed Mian QaisarSaeed Mian Qaisar
Saeed Mian Qaisar
AWAsad Waqar
Asad Waqar
FLFahad Lateef
Fahad Lateef
AAAhmad Saeed Alzahrani
Ahmad Saeed Alzahrani
The cement industry is a major energy consumer, with most of its costs associated with fuel and energy requirements. While traditional thermal power plants generate electricity, they are both harmful and inefficient. In this study, battery depth of discharge (DOD) is evaluated for four different battery technologies in the context of the cement industry. The battery technologies evaluated are lead-acid (LA), lithium-ion (Li-ion), vanadium redox (VR), and nickel-iron (Ni-Fe). Five cement plants in Pakistan are considered, including Askari Cement Plant, Wah (ACPW), Bestway Cement Plant, Kalar Kahar (BCPKK), Bestway Cement Plant, Farooqia (BCPF), Bestway Cement Plant, Hattar (BCPH), and DG Cement Plant, Chakwal (DGCPC). Four hybrid energy generation models (HEGMs) were proposed using the HOMER pro software. HEGM-1 combines a diesel generator, photovoltaic system, converter, and battery system, while HEGM-2 consists of a photovoltaic system, converter, and battery system. HEGM-3 is a grid-connected version of HEGM-1 and HEGM-4 is the grid-connected version of HEGM-2. A reference base model using only grid connection is also considered. A multi-criteria decision analysis (MCDA) was performed using a cumulative objective function (COF) that includes net present cost (NPC), levelized cost of energy (LCOE), and greenhouse gas (GHG) emissions. The main objective was to maximize COF while minimizing NPC, LCOE, and GHG emissions using optimal battery technology and DOD. The results indicate that VR is the most optimal battery technology, with a DOD of 10% achieved in DGCPC using HEGM-3. This results in a 61.49% reduction in NPC, 78.62% reduction in LCOE, and 84.00% reduction in GHG emissions compared to the base model.

11 November 2022 in Preprints.org
Verified
Preprint
Open access
PDF file
Yasir BasheerYasir Basheer
Yasir Basheer
Saeed Mian QaisarSaeed Mian Qaisar
Saeed Mian Qaisar
AWAsad Waqar
Asad Waqar
FLFahad Lateef
Fahad Lateef
AAAhmad Saeed Alzahrani
Ahmad Saeed Alzahrani
Cement industry is one of the highest energy consuming industries. The quantity of fuel and energy needed accounts for most of the cost of cement manufacturing. Thermal power plants generate electricity but are harmful and ineffective by nature. As a backup mechanism to account for main grid failures, batteries can be utilized. In this paper the first ever investigation on battery’s depth of discharge (DOD) for four different kinds of battery technologies is carried out in the framework of cement industry. The intended battery technologies are the lead-acid battery (LA), lithium-ion battery (Li-ion), vana-dium redox battery (VR), and nickel–iron battery (Ni-Fe). Four hybrid energy generation models (HEGMs) for five cement plants of Pakistan using the HOMER pro software are proposed. Cement plants includes Askari Cement Plant, Wah (ACPW); Bestway Cement Plant, Kalar Kahar (BCPKK); Bestway Cement Plant, Farooqia (BCPF); Bestway Cement Plant, Hattar (BCPH); and DG Cement Plant, Chakwal (DGCPC). HEGM-1 comprises of a diesel generator (DGen), a photovoltaic system (PV), a converter, and a battery system. HEGM-2 comprises of a PV system, a converter, and a battery system. HEGM-3 is the grid-connected version of HEGM-1 and HEGM-4 is the grid-connected version of HEGM-2. A base-model consisting of grid only is used as a reference. A multi-criteria decision analysis (MCDA) is performed by formulating a cumulative objective function (COF) which includes net present cost (NPC), levelized cost of energy (LCOE), and greenhouse gas (GHG) emissions. The principal objective is the maximization of COF while simultaneously minimizing the objectives (NPC, LCOE and GHG emissions), based on optimal battery technology and DOD. The results reveal that VR is the most suitable battery technology with 10% DOD. It is achieved for DGCPC with HEGM-3 with 61.49% of NPC, 78.62% of LCOE and 84.00% of GHG emissions reduction as com-pared to the base model.

7 January 2026 in Research Square
Verified
Preprint
Open access
PDF file
Juan Ignacio Pérez-DíazJuan Ignacio Pérez-Díaz
Juan Ignacio Pérez-Díaz
DGDarío González-Salgado
Darío González-Salgado
IKIgor Kwiecinski
Igor Kwiecinski
Marcos BlancoMarcos Blanco
Marcos Blanco
Yasir BasheerYasir Basheer
Yasir Basheer
José-Ignacio SarasúaJosé-Ignacio Sarasúa
José-Ignacio Sarasúa
This paper presents a methodology to incorporate the cost of the turbine wear in the optimization models used for the day-ahead energy and reserve scheduling of a hydropower plant. Two different optimization model formulations are proposed for this purpose. One considers the wear cost assuming the hydro unit operates in steady-state within each market programming period, and the other considers the wear cost taking into account the output power variations due to the provision of primary and secondary frequency control. The two model formulations are compared to a wear-unaware one by means of a set of computational experiments. The computational experiments comprise scenarios consistent with both the new regulation of the secondary frequency control service in Spain and the previous one so as to highlight the impact the new may have on the turbine wear. The results of the experiments show that the consideration of the turbine wear in the day-ahead energy and reserve scheduling yield different operational decisions and may result in a higher profit under certain operating conditions and price scenarios.